When multiple hook-and-loop straps are used in the same rack, stagger the strap location. Ensure that
the straps are adjacent to each other when viewed from top to bottom. This positioning will enable the
rack rail to slide easily in and out of the rack.
7.
Secure the cables to the cable management arm.
IMPORTANT:
When using cable management arm components, leave enough slack in each of
the cables to prevent damage to the cables when the server is extended from the rack.
8.
Connect the power cord to the AC power source.
Removal and replacement procedures
33
Summary of Contents for HPE ProLiant DL180 Gen10
Page 14: ...14 Customer self repair ...
Page 15: ...Customer self repair 15 ...
Page 16: ...16 Customer self repair ...
Page 17: ...Customer self repair 17 ...
Page 56: ... Secondary riser cage Slot 4 Slot 5 or 6 56 Removal and replacement procedures ...
Page 63: ... Secondary riser cage Slot 4 Slot 5 or 6 Removal and replacement procedures 63 ...
Page 124: ... 24 bay SFF hot plug drive model Fan bay numbering 124 Component identification ...
Page 130: ...Box 2 to type a controller Box 2 to type p controller 130 Cabling ...
Page 131: ...Box 3 to system board Box 3 to type a controller Cabling 131 ...
Page 132: ...Box 3 to type p controller 8 bay SFF power cable default 132 Cabling ...
Page 137: ...Mini SAS cable to SAS expander Cabling 137 ...
Page 139: ... M 2 SSD enablement board installed in secondary riser Cabling 139 ...
Page 144: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 144 Cabling ...
Page 146: ... Secondary riser cage Slot 4 Slot 5 or 6 146 Cabling ...