WARNING:
To reduce the risk of electric shock or damage to the equipment:
• Do not disable the power cord grounding plug. The grounding plug is an important safety
feature.
• Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at all
times.
• To disconnect power to the equipment, unplug the power cord from the power supply.
• Do not route the power cord where it can be walked on or pinched by items placed against it.
Pay particular attention to the plug, electrical outlet, and the point where the cord extends
from the server.
Releasing the cable management arm
Procedure
1.
Remove the cable tie if installed.
2.
Release the cable management arm and then swing the arm away from the rack.
Removing the access panel
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the internal
system components to cool before touching them.
CAUTION:
To prevent damage to electrical components, take the appropriate anti-static precautions
before beginning any installation, removal, or replacement procedure. Improper grounding can
cause electrostatic discharge.
CAUTION:
Do not operate the server for long periods with the access panel open or removed.
Operating the server in this manner results in improper airflow and improper cooling that can lead to
thermal damage.
34
Removal and replacement procedures
Summary of Contents for HPE ProLiant DL180 Gen10
Page 14: ...14 Customer self repair ...
Page 15: ...Customer self repair 15 ...
Page 16: ...16 Customer self repair ...
Page 17: ...Customer self repair 17 ...
Page 56: ... Secondary riser cage Slot 4 Slot 5 or 6 56 Removal and replacement procedures ...
Page 63: ... Secondary riser cage Slot 4 Slot 5 or 6 Removal and replacement procedures 63 ...
Page 124: ... 24 bay SFF hot plug drive model Fan bay numbering 124 Component identification ...
Page 130: ...Box 2 to type a controller Box 2 to type p controller 130 Cabling ...
Page 131: ...Box 3 to system board Box 3 to type a controller Cabling 131 ...
Page 132: ...Box 3 to type p controller 8 bay SFF power cable default 132 Cabling ...
Page 137: ...Mini SAS cable to SAS expander Cabling 137 ...
Page 139: ... M 2 SSD enablement board installed in secondary riser Cabling 139 ...
Page 144: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 144 Cabling ...
Page 146: ... Secondary riser cage Slot 4 Slot 5 or 6 146 Cabling ...