Server
operations
39
Installing the access panel
1.
Place the access panel on top of the server with the hood latch open. Allow
the panel to extend past the rear of the server approximately 1.25 cm (0.5 in).
2.
Push down on the hood latch. The access panel slides to a closed position.
Accessing the product rear panel
Cable management arm with left-hand swing (on page
39
)
Cable management arm with right-hand swing (on page
39
)
Cable management arm with left-hand swing
To access the server rear panel, open the cable management arm:
Cable management arm with right-hand swing
NOTE: To access some components, you may need to remove the
cable management arm.
To access the product rear panel components, open the cable management arm:
Summary of Contents for DL385 - ProLiant - G5
Page 1: ...HP ProLiant DL385 Server User Guide March 2005 Second Edition Part Number 376536 002 ...
Page 8: ......
Page 34: ......
Page 44: ......
Page 122: ......
Page 135: ...Troubleshooting 135 ...
Page 138: ...138 HP ProLiant DL385 Server User Guide ...
Page 141: ...Troubleshooting 141 ...
Page 144: ...144 HP ProLiant DL385 Server User Guide ...
Page 147: ...Troubleshooting 147 ...
Page 152: ......
Page 160: ...160 HP ProLiant DL385 Server User Guide Japanese notice BSMI notice ...