Hardware options installation 32
o
SAS hard drive
9.
Connect the hard drive data cables:
o
For SATA hard drives, connect the cable to the system board.
For more information, see the server installation sheet.
o
For SAS hard drives, connect the optional SAS/SATA controller cable to the optional SAS
controller.
10.
Install the access panel.
11.
Install the server in the rack.
Resume normal server operations.
Summary of Contents for DL120 - ProLiant - G5
Page 46: ...Cabling 46 BBWC battery cabling to an optional controller Power supply 500 W cabling ...
Page 47: ...Cabling 47 SATA cabling SATA cabling to the SGPIO connector and the 12C cable connector ...
Page 49: ...Cabling 49 Fan cabling ...
Page 105: ...Technical support 105 ...
Page 106: ...Technical support 106 ...