
Hardware options installation 28
3.
Remove the hard drive.
Installing a hot-plug hard drive
IMPORTANT:
Hot-plug capability and drive LED support are only available when a supported
optional controller is installed in the server.
1.
Power down the server (on page
15
).
2.
Remove the existing hard drive blank ("
Removing a hard drive blank
" on page
27
).
3.
Prepare the hard drive.
Summary of Contents for DL120 - ProLiant - G5
Page 46: ...Cabling 46 BBWC battery cabling to an optional controller Power supply 500 W cabling ...
Page 47: ...Cabling 47 SATA cabling SATA cabling to the SGPIO connector and the 12C cable connector ...
Page 49: ...Cabling 49 Fan cabling ...
Page 105: ...Technical support 105 ...
Page 106: ...Technical support 106 ...