Setup and Installation Guide
www.hp.com
3-1
3
Planning the Installation
Optimum Environment
For maximum performance and availability from your HP CCI
solution, be sure that your operating environment meets the required
specifications for the following:
■
Floor strength
■
Space
■
Power
■
Electrical grounding
■
Temperature
■
Airflow
For detailed information on these requirements, refer to the HP
ProLiant BL e-Class System Overview and Planning white paper on
the Documentation CD and at the HP website:
www.hp.com
Rack Warnings and Cautions
Before installing your rack, observe the following warnings and
cautions:
Å
WARNING:
To reduce the risk of personal injury or equipment damage,
be sure that:
• The rack is adequately stabilized before installing or removing a
component.
• Only one component is extended at a time.
• The leveling jacks are extended to the floor.
• The full weight of the rack rests on the leveling jacks.
• The stabilizers are attached to the rack for single-rack installation.
Summary of Contents for Blade bc1000
Page 80: ...5 22 www hp com Setup and Installation Guide Deployment and Management ...
Page 116: ...D 22 www hp com Setup and Installation Guide Troubleshooting ...
Page 128: ...E 12 www hp com Setup and Installation Guide LEDs and Switches ...
Page 134: ...F 6 www hp com Setup and Installation Guide Specifications ...
Page 138: ...G 4 www hp com Setup and Installation Guide Blade PC Battery ...
Page 146: ...Index 8 www hp com Setup and Installation Guide Index ...