Installing the SAN Switch 2/8
48
hp StorageWorks SAN Switch 2/8 Installation Guide
2. Connect the Serial cable to the SAN Switch 2/8 Serial port, see
Figure 15
.
Figure 15: Connecting the Serial cable
3. Connect the other end of the Serial cable to an RS-232 Serial port on the
workstation. If no RS-232 Serial port is available on the workstation, the
adapter on the end of the Serial cable can be removed to use the RJ-45
connector to create a Serial connection.
4. Verify that the switch power is on and POST is completed. See the “
Power On
Self-Test
” section, on page page 46 in this chapter.
5. Power on the workstation and establish a connection to the switch using a
terminal emulator application (such as Hyperterminal).
Note:
Step 6 shows instructions specific to HyperTerminal. If using a different
application, consult the specific application’s documentation.
6. Using Hyperterminal configure the port settings as follows:
■
Bits per second: 9600
■
Databits: 8
■
Parity: None
■
Stop bits: 1
■
Flow control: None
SHR-2497B
Summary of Contents for AA-RSB6B-TE
Page 8: ...Contents 8 hp StorageWorks SAN Switch 2 8 Installation Guide ...
Page 22: ...Overview 22 hp StorageWorks SAN Switch 2 8 Installation Guide ...
Page 72: ...Managing the SAN Switch 2 8 72 hp StorageWorks SAN Switch 2 8 Installation Guide ...
Page 82: ...Regulatory Compliance Notices 82 hp StorageWorks SAN Switch 2 8 Installation Guide ...