Installing the SAN Switch 2/8
40
hp StorageWorks SAN Switch 2/8 Installation Guide
3. Install two M5 U-type Tinnerman clips for each of the front columns of the
rack in the top and bottom positions of the three-hole EIA pattern as shown in
Figure 9
.
Figure 9: Installing the tinnerman clips
4. Assemble the outer rails by completing the following steps:
a.
As an aid in assembly, two rubber washers have been included to help
keep the rear slotted portion of the outer rail flush against the rear rail-tray
brackets. Install them as shown in
Figure 10
.
1
M5 U-type tinnerman clips
2
Upright rack post
SHR-255
1
2
Summary of Contents for AA-RSB6B-TE
Page 8: ...Contents 8 hp StorageWorks SAN Switch 2 8 Installation Guide ...
Page 22: ...Overview 22 hp StorageWorks SAN Switch 2 8 Installation Guide ...
Page 72: ...Managing the SAN Switch 2 8 72 hp StorageWorks SAN Switch 2 8 Installation Guide ...
Page 82: ...Regulatory Compliance Notices 82 hp StorageWorks SAN Switch 2 8 Installation Guide ...