Subject to modifications
A-TRON Blockheizkraftwerke GmbH
89 of 131
6.6.6.3.3.
Curve allocation
Pressing the "Curve allocation" button opens the following window.
When assigning characteristic curves, the number of characteristic curves to be set is
equal to the number of CHP plants in the cascade.
The individual values can be entered in the yellow box, e.g. the modulation start point for
CHP plant position no. 1 (blue box or see point 1). Differences of 5 degrees Celsius within
the cascade should be taken into account. The individual values can be changed by
tapping the respective box.
The assignment of the cascade position numbers and the characteristic curves to the
participants depends on the number of operating hours of the respective participants and
is inversely proportional. The participant with the highest number of operating hours gets
the first position number and the participant with the lowest number of operating hours
gets the last position number.
Figure 44: Menu - Cascade management 3
Notice
: - Set the characteristic curves before starting the cascade.