6.6.6.3.5.
Cascade values
If the "Cascade values" button is pressed, it is possible to view the current values /
parameters of the set cascade of the respective CHP plant.
Figure 46: Menu - Cascade management 5
6.6.6.4.
Thermal load connection (menu structure 2.6.4.) (optional for biogas
and/or sewage gas operation)
This function allows emergency cooling of the Hoval Eco-Plus CHP plant to be controlled
in biogas and/or sewage gas operation. This function can also be optionally used for
control of another heating circuit regulation.
The following window opens when the "Thermal load connection" button is pressed.
If the thermal load connection is activated, the return temperature at which the thermal
load connection is to take place is set under "Switch on at" and the period over which this
function is to remain activated is specified under "Minimum duration".
Figure 47: Menu
– Thermal load connection