6 General checklist
■
Can the roof support the units?
■
Is the access panel accessible without obstructions?
■
Are there any installation obstacles in the hall, such as
craneways, machinery, etc.?
■
For emission measurements from the roof: is the roof
accessible in the vicinity of the units?
■
Are the application limits complied with?
■
Which gas category is used?
■
How high is the gas supply pressure?
■
Are unit options required?
■
Are control system options required?
■
How are the control zones subdivided?
■
Which operating options are to be used?
■
Where are the operating options to be located?
H
73
System design
General checklist
Installation site