These instructions have been written to give a brief description of the CT-plus
Calorifier, its installation, commissioning, operation and subsequent maintenance.
The installation of calorifiers and their ancillary equipment is normally carried out by an heating
engineer. For the purpose of this manual he is regarded as the installer, and, as such, it is his
responsibility to ensure that he has read and understood the contents of this manual before
installing the calorifier.
It is essential that each calorifier has all services permanently connected to it before commis-
sioning is requested.
The installation should be in accordance with
current I.E.E. regulations, relevant British Stan-
dard and Codes of Practice, Building Regula-
tions and Local Authority Bylaws.
Commissioning should be arranged via the
heating engineer. Hoval engineers are available
to carry out this work if requested. Where the
calorifier installation is part of a Hoval boiler
package it will normally be commissioned at
the same time and entry made on the report
opposite
Commissioning/Combustion Report
A note should be entered below by the person responsible for the plant, giving the boiler, calorifier
model and its output and reference “K” number, as indicated on the nameplate.
For completion by Plantroom Attendant
Calorifier Model:
Boiler type / Model:
Date of installation:
Output l/hr:
“K” Number:
For technical, servicing or parts enquiries,
telephone, fax or e-mail to Hoval Ltd quoting
the calorifier(s) K. number, as above