![Hoval BioLyt 100 Technical Information Installation Instructions Download Page 28](http://html1.mh-extra.com/html/hoval/biolyt-100/biolyt-100_technical-information-installation-instructions_2170720028.webp)
4.6
Fitting the probes, sensors and cables BioL
yt
(100-160)
Pass
all
the
cables
needing
to
be
routed
from
the
automatic
firing
device
to
the
top
or
rear
side
of the boiler
through
the cable
duct (27, Fig. 29). Cable
outlets are provided
in
the form of lateral
openings at the corresponding points.
NOTICE
Route sensor cables and 230V cables separately
.
Rear of the boiler (see also Fig. 31):
-
Insert
the
flue
gas
temperature
sensor
(AGF)
into
the
immersion
sleeve
on
the
flue
gas
connector
and secure with the capillary support spring. -Route and connect
the cables
for the heating
surface cleaner
drive
(HFR) (make sure the cables
are not trapped in the lever mechanism). -Route and connect the cable for the ash discharge screw drive (AST). -
Insert
the
boile
r
temperature
sensor
(WF)
from
the
automatic
firing
device
into
the
immersion
sleeve and secure.
The safety temperature limiter sensor (STB) will need to be installed
into this
immersion sleeve when proceeding with the installation of the casing. -Mount the return temperature sensor (BRU) on the return line. -Install the lambda
probe
(see Fig. 30, for BioL
yt (130-160)).
The BioL
yt (100) has a pre-installed
¾" plastic coupling for this purpose. -Insert the cable for the induced-draught fan (SZG) (SZG; incl. extension cable).
Front side of the boiler (see also Fig. 32):
-
Route
the
cable
of
the
lower
fill
level
sensor
(PBSu)
in
the
pellet
hopper
to
the
automatic
firing
device. -
Insert
the
combustion
chamber
temperature
sensor
(BRF)
into
the
immersion
sleeve
and
fix
it
in
position. -
Insert
the
feeder
screw
temperature
sensor
(ESF)
into
the
immersion
sleeve
and
fix
it
in
position
(cylinder screw M4x10). -Plug the cables for the pressure fan (DG+DG-PWM) into the fan.
After
all
the
cables
have
been
routed,
proceed
to
fit
and
secure
the
plug-in
connections
according
to the diagram on the automatic firing device.
NOTICE
The cables that lead from the burner mechanism
to the clamping plate must be bund
-
led so that the burner can be swivelled open without difficulty (see Fig. 41).
See also Fig. 40 and Fig. 41, chapter 6.3.2.
Lambda probe
Fig. 30
AGF
Fi-
gure shows BioL
yt (130-160)
Figure shows BioL
yt (130-160)
Figure shows BioL
yt (130-160)
28
4 214 852 / 01
ASSEMBLy BIOLyT (100-160)
Summary of Contents for BioLyt 100
Page 7: ...7 4 214 852 01 NOTES...
Page 21: ...21 4 214 852 01 NOTES...
Page 51: ...51 4 214 852 01...