3.10 Fitting the ash box and miscellaneous BioLyt (50-75)
36. Slide the ash box (50) into the screw pipe (do not forget the O-ring 50a, Fig. 21); the height of the rollers can be
adjusted by means of the nuts provided on the sides.
The ash box (50) must be aligned using the adjustable roller supports, as otherwise the connection to the
boiler will not be airtight. Ash box should be raised slightly at the wheels (a few mm); it will then be pressed
optimally against the gasket (50a) when the threaded rod (51) is tightened.
37. Lock the ash box (50) in position using the threaded rod (51); remove the nut beforehand (only serves as a trans-
port protection).
38. Hook the small front plate (52) to the side walls.
39.
Affix the adhesive type label.
Fig. 21
50
52
50a
51
53
20
4 214 852 / 01
ASSEMBLy BIOLyT (50-75)