45
7. REMOVAL AND REPLACEMENT OF CONDENSING PRESSURE
REGULATOR (C.P.R.) - REMOTE AIR-COOLED MODEL ONLY
IMPORTANT
Always install a new Drier every time the sealed refrigeration system is
opened. Do not replace the Drier until after all other repairs or replacement
have been made.
1) Turn off the power supply.
2) Remove the panels from the remote condenser unit.
3) Recover the refrigerant and store it in an approved container.
4) Remove the C.P.R. using brazing equipment.
5) Braze the new C.P.R. with nitrogen gas flowing at the pressure of 3 - 4 PSIG.
WARNING
Always protect the C.P.R. body by using a damp cloth to prevent the C.P.R.
from overheating. Do not braze with the C.P.R. body exceeding 250°F.
6) Install the new Drier in the icemaker.
7) Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.
8) Evacuate the system and
charge it with refrigerant.
See the label on the Control
Box in the icemaker.
9) Replace the panels in their
correct position.
10) Turn on the power supply.
Summary of Contents for F-800MAH
Page 13: ...13 III TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERATION CIRCUIT F 800MAH C...
Page 14: ...14 F 800MWH C...
Page 15: ...15 2 WIRING DIAGRAM F 800MAH C F 800MWH C...
Page 17: ...17 b When Reservoir has been filled Gear Motor starts immediately...
Page 18: ...18 c Compressor starts about 60 sec after Gear Motor starts...
Page 19: ...19 d Bin Control operates and about 6 sec later Compressor and Gear Motor stop simultaneously...
Page 20: ...20 e Low Water Except Water cooled Model...
Page 23: ...23 h When Flush Timer operates for 15 min every 12 hours...
Page 26: ...26 4 TIMING CHART...
Page 27: ...27...
Page 28: ...28...