If the tram line distribution box is equipped with
a track width change-over, the track width must
only be changed when the valves are open.
This can be checked on the terminal (no tram
line must be switched) or by checking the marks
on the valves.
NOTE
¾
Check the distributors regularly for foreign
objects and deposits to avoid faults during
seed transport and the function of the valves.
Seed flow monitoring
The seed flow sensors monitor the seed and
fertiliser flow. They alarm in case of quanti
-
ty changes during placement and in case of
blocked hoses.
The sensors are connected in series, and the
numbers indicate the order.
In case of an alarm, these sensor numbers help
when troubleshooting the hoses.
If the monitored seed hoses are also fitted with
valves for the tram line control, these numbers
must also be entered in a list in the terminal
menu for tram line rhythm - see
E-Manager
in-
structions.
38
39
Summary of Contents for Pronto 8 SW
Page 2: ......
Page 5: ......
Page 22: ...Position of safety stickers 2 2 18...
Page 52: ...Tightening torques on the coulter 20 Nm 55 Nm 38 Nm 20 5 Nm 100 Nm 5 Nm 48...
Page 75: ......