Checks before and during use on
the field
NOTE
¾
Drilling must be checked when starting work
and, in case of larger fields also regularly in
between!
The working quality essentially depends on the
adjustments and checks made prior to and dur-
ing use, as well as on regular care and mainte-
nance of the machine.
¾
Carry out all maintenance tasks and adjust-
ments before starting to work.
Machine
¾
Have the hydraulic lines been connected
without being mixed up?
¾
Has the machine been levelled in working
position and the drilling depth correctly ad-
justed?
¾
Have the bout markers been set to the cor-
rect length?
Cultivation tools
¾
Are coulters, harrow and other cultivation tools
and optional equipment still in a serviceable
state?
¾
Are all cultivation tools adjusted correctly?
¾
Has the machine been levelled in working
position?
¾
Has the drilling depth been set correctly?
¾
Have the bout markers been set to the cor-
rect length?
Pneumatic system
¾
Is the hydraulic fan connected to a pressure
free return flow?
¾
¾
Are the solenoid valves installed in the correct
seed pipes for the tram lines, has the tramline
rhythm been set and do the valves close?
¾
Do the seed hoses not sag and are they free
of water and deposits?
¾
Are all air lines between fan and coulters leak
tight and firmly connected?
¾
Does air flow uniformly out of all coulters?
¾
Has the air volume been set correctly on the
fan? Does the seed bounce out of the seed
furrow, or remain in the pipes and cause
blockage?
¾
Is the air separator on the head free of block-
age and deposits?
37
Summary of Contents for Pronto 8 SW
Page 2: ......
Page 5: ......
Page 22: ...Position of safety stickers 2 2 18...
Page 52: ...Tightening torques on the coulter 20 Nm 55 Nm 38 Nm 20 5 Nm 100 Nm 5 Nm 48...
Page 75: ......