![Horizon Fitness Perfect Binder BQ-260 Manual Download Page 47](http://html1.mh-extra.com/html/horizon-fitness/perfect-binder-bq-260/perfect-binder-bq-260_manual_2162393047.webp)
41
5. Operation Procedure
5-1
Followings are process of pad binding
(with milling).
1) Stock is clamped with clamper and
transported to milling unit and milled off
spine.
2) Stock is transported to home position and
clamper is automatically opened on level
plate to rejog stock.
3) Stock is applied glue on melt tank unit.
4) Stock is stopped over nipping unit for
several seconds to dry glue.
5) Stock is transported to home position
through over lowered melt tank unit.
6) Stock is released from clamper.
5-2
Followings are process of pad binding
(without cover)
1) Stock is clamped with clamper and
transported to melt tank unit.
2) Stock is applied glue on melt tank unit.
3) Stock is stopped over nipping unit for
several seconds to dry glue.
4) Stock is transported to home position
through over lowered melt tank unit.
5) Stock is released from clamper.
5-2 Pad Binding
Summary of Contents for Perfect Binder BQ-260
Page 6: ...VI This page is intentionally left blank...
Page 14: ...8 1 Machine Parts Descriptions This page is intentionally left blank...
Page 15: ...9 2 Installation Instructions 2 Installation Instructions 2 1 Installation Instructions 10...
Page 26: ...20 3 Before Starting Operation This page is intentionally left blank...
Page 42: ...36 4 Set Up BQ 260 This page is intentionally left blank...
Page 48: ...42 5 Operation Procedure This page is intentionally left blank...
Page 67: ...61 8 maintenance 8 Maintenance 8 1 Once A Month 62 8 2 As Required 63...