![Horizon Fitness Perfect Binder BQ-260 Manual Download Page 41](http://html1.mh-extra.com/html/horizon-fitness/perfect-binder-bq-260/perfect-binder-bq-260_manual_2162393041.webp)
35
4. Set Up BQ-260
4-7 Test Binding
4-7-2 Pad Binding
Test binding is necessary to confirm each
unit is set up properly.
1.
Prepare stock for test binding.
NOTE
Stock for test binding must be same as your
job.
2.
True up stock and insert stock into
clamper. Left side of stock must touch
register shaft in clamper.
NOTE
Left side of stock must be register side for
cover and stock. Spine of stock must face
down.
3-1
When with milling mode is selected,
depress milling start button.
- Lamp on milling start button will turn off
and milling cutter start rotating.
- Blower pump will start at same time and
dust bag swells with air.
3-2
When without milling mode is selected,
lamp in milling start button will not be on.
4.
Depress start button.
- Confirm that lamp on start button is on
and then depress start button.
- Clamper will start for binding and returns
to its home position (start position) after
padding.
5.
Take out book from clamper and check
binding.
- When binding result does not satisfy your
requirement, perform "4-1" to "4-7" (page
22 to 35) again to readjust each unit on
binder.
6.
Depress level plate button to reset level
plate.
7.
Depress stop button.
Stop Button
Start Button
Level Plate Button
Clamper
Milling Start Button
Summary of Contents for Perfect Binder BQ-260
Page 6: ...VI This page is intentionally left blank...
Page 14: ...8 1 Machine Parts Descriptions This page is intentionally left blank...
Page 15: ...9 2 Installation Instructions 2 Installation Instructions 2 1 Installation Instructions 10...
Page 26: ...20 3 Before Starting Operation This page is intentionally left blank...
Page 42: ...36 4 Set Up BQ 260 This page is intentionally left blank...
Page 48: ...42 5 Operation Procedure This page is intentionally left blank...
Page 67: ...61 8 maintenance 8 Maintenance 8 1 Once A Month 62 8 2 As Required 63...