
118
④when the instrument is moved
to the point NO.115, measure
NO.916 point, and note the
measured result as NO.116.
F2
⑤ in order to calculate the
closure difference, you must set
a station at NO.116(That is, No.
916),collimate another known
point(such as No. 917),measure
NO.917 point,and note the
measured result as NO.117.
Then No.117 point is the
closure point.
F2
2.Adjustment
Operation procedure
operation
dispaly
①
pressF3in page 3 of the
measuring program, then
select a file which saves
traverse data ,enter traverse
adjustment interface.
ENT
②input the NO.of starting point,
and then press ENT key.
ENT