EN1H-1374GE23 R1014 - Translation of original
25
Honeywell GmbH
GB
17. Proof of Maintenance
Honeywell
74821 Mosbach Germany
Compact booster unit
According to normative requirements for potable water, this central booster unit requires frequent maintenace contucted by enabled personal, which needs to
be documented after compleshion.
This compact booster unit is subject to the standards for potable water and guidelines for maintenance therein, and have to be maintained regularly by qualified
personnel and the results have to be documented.
Date
Operating company
Name
Signature