USER GUIDE
ARENA/ RANGER
109
EN2Z-0906GE51
R0708
Or,
h. Copy switchpoints from another daily schedule to the new daily schedule as
follows:
i. Right-click on the new daily schedule.
j. Select
Copy switchpoints from
, then click on daily schedule from which you
want to copy the switchpoint settings, for example,
Workday
.
The copied settings are reflected on the daily schedule time table on the right.
4. Click
Save
button on top of the Schedules tree.
Update Daily Schedule / Edit Switchpoint
This function allows updating a daily schedule by editing the following switchpoint
settings:
•
Value
•
Start and stop time
•
Optimization status
1. In
the
Schedules
tree, expand the tree and click on the daily schedule you want
to update.
2. In the time table, right-click in the switchpoint area (green) and click
Update
.
The
Edit Value
dialog box displays.
Summary of Contents for ARENA
Page 1: ...ARENA RANGER User Guide Copyright 2008 Honeywell GmbH All Rights Reserved EN2Z 0906GE51 R0708 ...
Page 2: ...ARENA RANGER USER GUIDE EN2Z 0906GE51 R0708 ...
Page 4: ...ARENA RANGER USER GUIDE EN2Z 0906GE51 R0708 ...
Page 158: ...ARENA RANGER USER GUIDE EN2Z 0906GE51 R0708 158 ...
Page 159: ...USER GUIDE ARENA RANGER 159 EN2Z 0906GE51 R0708 ...