54
Start-up
figure 3)
.
• Use an appropriate drill to make the 6 mm holes
as illustrated
(see figure 3
.
• Insert the supplied plugs and screws into the drill
holes (
see figure 4
). Allow the screws to protrude
5,5 mm.
• Attach the floor heating controller using the
screw holes on the screw heads (
see figure 5
).
5.2
DIN rail mount
For mounting the floor heating controller to a DIN rail,
please proceed as follows:
• Place the floor heating controller onto the DIN
rail (
see figure 6
).
• Latch the floor heating controller by pressing the
spring latches
(F)
upwards (
see figure 7
).
• Make sure that the spring latches are completely
latched and that the device is seated solidly on
the rail.
6
Start-up
6.1
Installation instructions
Before installing and setting up the device, you
have to put a Homematic IP Wired Access Point
(HmIPW-DRAP) into operation first.