Homa TCV 409 Series Original Instruction Manual Download Page 12

 

12 

 

Note:

 Only the proper adjustement and fixing of the float 

switch cable will guarantee a reliable pump operation. Af-
ter any modification of the float switch adjustment the  
function must be checked by a test-run of the pump. 
 

8. Start-Up 

Never let the pump run dry for a long time of period, 

as it will destroy the pump (danger of overheating). 

Start the pump, when the system has been filled with 

liquid and vented. Open the isolating valves. Check the 
position of the float switches. If necessary, check the di-
rection of rotation of the pump, as described under 6.4. 
Put the switch on the control box to the required mode of 
operation. 
 

9. Maintenance and Repair 

In case of a defect of the pump, a repair shall be car-

ried out only by the manufacturer or through an authorized 
workshop. Modifications of the pump must be confirmed 
by the manufacturer. Only HOMA spare parts shall be 
used. 

In accordance with the product liability law we point 

out that we shall not be liable for damages caused by our 
product due to unauthorized repair by persons other than 
the manufacturer or an authorized workshop or due to the 
use of spare parts other than original HOMA parts. The 
same product liability limitations are valid for accessories. 

Before maintenance or repair disconnect the pump 

from the power supply to avoid accidental starting of the 
pump! 

Before maintenance or repair make sure that all rotat-

ing parts stand still! 

Before carrying out maintenance and service, the 

pump must be thoroughly flushed with clean water. Rinse 
the pump parts in clean water after dismanteling. 

At pump types with oil chamber an overpressure can 

escape with loosening of the oil chamber control screw. 
Screw only when pressure balance took place. 
 
Pumps running under normal operation conditions should 
be inspected at least once a year. If the pumped liquid is 
very muddy or sandy or if the pump is operating continu-
ously, the pump should be inspected every 1.000 operat-
ing hours. 
 
For long and trouble-free operation of the pump, following 
points should be checked regularly: 
 
- Nominal current (A): Check with amp-meter. 

- Pump parts and impeller: Check for possible wear.  
Replace defective parts. 

- Ball bearings: Check the shaft for noisy or heavy opera-
tion (turn the shaft by hand). Replace defective ball bear-
ings. A general overhaul of the pump is usally required in 
case of defective ball bearings or poor motor function. 
This work must be carried out by an authorized  
service workshop. 

- Cable entry: Make sure that the cable entry is watertight 
and that the cables are not bent sharply and/or pinched. 

Visual control at pump types with oil chamber (mod-
els without cooling jacket or model „U“ with cooling 
jacket and open cooling circuit): 
 

Oil level and oil condition: 
The condition of the mechanical seals can be visually con-
trolled as follows:  
Put the pump in horizontal position, so that the screw of 
the oil chamber is on top (for larger pumps: one of both oil 
chamber screws). 
Remove the screw and take out a small quantity of oil.  
The oil becomes greyish white like milk if it contains water. 
This may be the result of defective shaft seals. 
In this case the condition of the shaft seals should be 
checked by a HOMA Service shop.

 

 
The oil should be replaced after 3000 operating hours. 
Oil type: degradable HOMA-ATOX. Used oil has to be 
disposed according to the existing environmental rules 
and regulations 
 

Servicing Contract  

For a regular expert execution of all necessary mainte-
nance and inspection we recommend the conclusion of a 
servicing contract by our HOMA Service. Please contact 
our HOMA customer service. 
 

Return of pumps 

 

If a pump has been used for a liquid which is injurious 

to health or toxic, the pump will be classified as contami-
nated. 
If HOMA is requested to service the pump, HOMA must 
be contacted with details about the pumped liquid, etc. 
before the pump is returned for service. Otherwise HOMA 
can refuse to accept the pump for service (see attach-
ment). 
Possible costs of returning the pump are paid by the cus-
tomer. However, any application for service (no matter to 
whom it may be made) must include details about the 
pumped liquid if the pump has been used for liquids which 
are injurious to health or toxic. 
 

Summary of Contents for TCV 409 Series

Page 1: ...Original Betriebsanleitung Original Instruction Manual HOMA Pumpenfabrik GmbH 02 2011 Industriestr 1 D 53819 Neunkirchen Seelscheid Baureihe Series TCV 409...

Page 2: ...2 Inhalt Contents Seite 3 Page 9 Seite 14 Page 14 DEUTSCH ENGLISH Bauma e Dimensions...

Page 3: ...f hrung den einschl gigen grundlegenden Sicherheits und Gesundheitsanforderungen der EG Maschinenrichtlinien entsprechen Bei einer nicht mit uns abgestimmten nderung der Pumpen verliert diese Erkl run...

Page 4: ...h unser Ger t verur sacht werden wenn die Hinweise und Vorschriften aus dieser Bedienungsanleitung nicht eingehalten werden nicht haften F r Zubeh rteile gelten die gleichen Be stimmungen 3 Einsatz un...

Page 5: ...Installation Maximale Eintauchtiefe beachten siehe Typenschild Bei Verwendung im Schachtbetrieb ist die Schacht ff nung nach Montage der Pumpe mit einer trittsicheren Ab deckung zu versehen Folgesch...

Page 6: ...4 Pumpe am Schaltger t in ge w nschter Betriebsart in Betrieb nehmen manueller Dau erbetrieb oder niveauabh ngiger Automatikbetrieb 9 Wartung und Reparatur Bei einem eventuellen Defekt der Pumpe d rf...

Page 7: ...Abfall von Elektro und Elektronikger ten zu den daf r bestimmten Sammelstellen zu bringen Durch isolierte Sammlung und ordnungsgem e Wiederverwendung Ihres elektrischen und elektronischen Abfalls k nn...

Page 8: ...ingen 03 31 740 40 70 0 74 31 95 83 24 Naumann Pumpen GmbH Co KG G Meier GmbH Am Wall 11 Gustav Schwab Str 16 14979 Gro beeren 72762 Reutlingen 03 37 01 52 50 0 71 21 26 90 0 HEKO Pumpen GmbH Pumpen Z...

Page 9: ...d construction the following pump types in the form in which they are marketed by us conform to the relevant fundamental safety and health re quirements of the EC Machine Directives TCV 409 EC Directi...

Page 10: ...s 3 Applications and Technical Description 3 1 Application Waste water submersible pumps must be fully submerged in the pumped medium TCV pumps are designed for pumping dirty water like rain water or...

Page 11: ...tion of the guide rail bracket on the inside of the pit cover Drill mounting holes and fasten the guide rail bracket provi sionally with 2 screws Put the auto coupling base unit in the exact position...

Page 12: ...the pump following points should be checked regularly Nominal current A Check with amp meter Pump parts and impeller Check for possible wear Replace defective parts Ball bearings Check the shaft for n...

Page 13: ...ra dial shaft ring change the oil Pump operates but gives no liquid Discharge valve closed or blocked Check the dis charge valve and possibly open and or clean Non return valve blocked Clean non retu...

Page 14: ...A B D E F G TCV 407 R 2 AG 180 221 95 400 180 Schachtinstallation mit Kupplungssystem Submerged Installation with auto coupling 13 Ersatzteilliste und Zeichnungen 13 Spare part list and drawings 13 1...

Page 15: ...g 550 02 U Scheibe Ring 550 03 U Scheibe Ring 732 Schwimmerhalter Float switch holder 800 Motor compl 812 01 Motorgeh usedeckel Motor housing cover 812 02 Deckeleinsatz Cover inset 822 Motorlagergeh u...

Page 16: ...53819 Neunkirchen Seelscheid Fax 49 22 47 7 02 44 Pump type see pump label Year of construction see pump label Position number of the spare part 1 2 3 4 Part description of the spare part 1 2 3 4 Requ...

Page 17: ...xisch nein ja welche Stoffe _____________________ tzend nein ja welche Stoffe _____________________ mikrobiologisch nein ja welche Stoffe _____________________ explosiv nein ja welche Stoffe _________...

Page 18: ...______________ corrosive no yes which substance __________________ microbiological no yes which substance __________________ explosive no yes which substance __________________ radioactive no yes whic...

Page 19: ...17...

Page 20: ...18...

Reviews: