
Version date: February 13
th
, 2017
Installation 19
3
User instructions
HOAF thermHIT® 75M/100M/125M
Chapter 3 - Installation
3 Installation
Read this chapter carefully before making the
HOAF thermHIT® 75M/100M/125M ready for
use.
3.1 Unpacking and inspection
Strictly observe the following instructions while
unpacking and installing the HOAF thermHIT®
75M/100M/125M!
Make sure none of the packaging material
remains in the HOAF thermHIT® 75M/100M/
125M. They may cause a fire hazard!
At the delivery, the packaging of the
HOAF thermHIT® 75M/100M/125M
consists
of one box.
1. Check
the packaging for damage.
Contact your dealer if there is any damage.
2.
If the packaging is not damaged;
unpack
the
HOAF thermHIT® 75M/100M/
125M
.
3.
The
HOAF thermHIT® 75M/100M/125M
is ready for use after you have
installed a gas bottle. See the next section.
3.2 Making the unit ready for use
For background information concerning the
different types of gas bottles, please refer to
The HOAF thermHIT® 75M/100M/125M can be
supplied with mounting materials for many
different tool carriers. Follow the instructions
supplied with the mounting hardware to mount
the tool carrier.