Intesis
TM
KNX
– DALI
User Manual r1.1 EN
© HMS Industrial Networks S.L.U - All rights reserved
This information is subject to change without notice
URL
http
s
://www.intesis.com
31 / 34
Finally, click on button ‘Connect’ in order to establish connection. Bar at the bottom in MAPS main window will
become green, switching from ‘Not Connected’ to ‘Connected’.
Now go back to ‘Configuration’ tab of MAPS, and click on button ‘Commissioning’:
Figure
A.6
DALI commissioning button
Commissioning window will appear:
Figure
A.7
DALI commissioning window
If having product version / template project supporting 2 DALI channels, channel to commission must be selected
between ‘Port A’ (top of the device) or ‘Port B’ (bottom of the device). In case of version supporting single DALI
channel, no selection is possible.
Also, if ballasts have been added to t
he configuration (see previos section ‘ECG declaration in project’) a list of
ballasts will appear in Configured ECG.