
INSTALLATION INSTRUCTIONS
FIGURE 5
TRU-FIT
DOOR & PANEL
STEP 6
Set the Wall Jamb (A) in place and make sure holes line up. Using six
#10 x 2” Wall Jamb Screws (F) provided, attach Wall Jamb (A) to wall.
(See Figure 6)
NOTE: Two extra screws (F) are provided in case of installation issues.
STEP 7
Now that you have the Wall Jamb (A) mounted, it is time to mount the
panel Wall Channel (C) and Curb Channel (D). You should have two differ
-
ent length pieces of the channel (ZSS 4504), the shorter one is the bottom
channel or Curb Channel (D), the longer is the Wall Channel (C). Take the
Curb Channel (D) and place on your “centerline” of your base and make
sure it is all the way against the wall. (See Figure 7)
Use your masking tape to secure the Curb Channel (D) to your base.
DO
NOT SUE SILICONE OR SCREWS YET, ONLY TAPE.
(See Figure 7)
STEP 8
Place Wall Channel (C) on top of Curb Channel (D) and “centerline”
up wall. Once the Wall Channel (C) is plumb, use a pencil to mark the
holes for drilling. Depending on the support behind the wall, Plastic
Anchors for Channels (J) may or may not be required. If you are unsure,
use the Plastic Anchors for Channels (J) to be safe. If using an anchor,
use 3/16” drill bits to drill holes on the specified marks. If wooden sup
-
port is present and no anchor is required, use 1/8” drill bits to drill holes
on specified marks (See Figure 8)
STEP 5
Put a small amount of silicone in each hole drilled. Place Plastic
Anchors (E), if needed, in holes and gently tap with a hammer. Be
sure not to hit the tile. (see Figure 5)
FIGURE 7
FIGURE 8
FIGURE 6
V5_21_26