Installing Your Array
3–17
Hitachi Simple Modular Storage 100 User’s Guide
•
Figure 3-9: Attaching the Power Cables
Verifying Startup Operations
To verify that your Hitachi Simple Modular Storage 100 is installed and
starts up properly:
1. On the back panel, verify that the green LEDs above each power
receptacle are blinking.
2. Set the
MAIN SW
switch on the back panel to the ON position to apply
power.
3. Listen for the fans to start operating and check for airflow.
4. On the front panel, verify that the green
Power
LED goes on (see
5. In a few minutes, verify that the green
Ready
LED on the front panel
goes ON (see
•
Power LED
Power LED
Power Cable Holder
Power Cable Holder
MAIN SW Switch
Summary of Contents for Simple Modular Storage 100
Page 6: ...vi Hitachi Simple Modular Storage 100 User s Guide ...
Page 14: ...xiv Preface Hitachi Simple Modular Storage 100 User s Guide ...
Page 24: ...1 10 Introduction Hitachi Simple Modular Storage 100 User s Guide ...
Page 34: ...2 10 Identifying Hardware Components Hitachi Simple Modular Storage 100 User s Guide ...
Page 66: ...4 10 Maintaining Your Array Hitachi Simple Modular Storage 100 User s Guide ...
Page 78: ...5 12 Troubleshooting Hitachi Simple Modular Storage 100 User s Guide ...
Page 82: ...A 4 Hitachi Simple Modular Storage 100 User s Guide ...
Page 99: ...1 Hitachi Simple Modular Storage 100 User s Guide ...