4 OPERATION
4-20
4.8.3 Starting up the system
To start up the CPU link system, perform the following procedure:
①
While the Windows® desktop is displayed, double-click the mouse on the [CPU LINK
SYSTEM] icon for S10mini or [S10V CPU LINK SYSTEM] icon for S10V. Or select
Start button – [(All) Programs] – [CPU LINK System] – [CPU LINK System] for
S10mini. Select Start button – [(All) Programs] – [Hitachi S10V] – [S10V CPU LINK
System] – [S10V CPU LINK System] for S10V.
②
When the [CPU LINK SYSTEM] for the S10mini or [ [S10V] CPU LINK SYSTEM] window
then opens, click the button for a desired command.
Figure 4-18 [CPU LINK SYSTEM] Window
Figure 4-19 [[S10V] CPU LINK SYSTEM] Window
Summary of Contents for LQE550
Page 1: ......
Page 2: ......
Page 17: ...This Page Intentionally Left Blank ...
Page 19: ...This Page Intentionally Left Blank ...
Page 28: ...1 SPECIFICATIONS ...
Page 34: ...2 NAMES AND FUNCTIONS OF EACH PART ...
Page 38: ...3 MOUNTING AND WIRING ...
Page 46: ...4 OPERATION ...
Page 75: ...4 OPERATION 4 30 Figure 4 33 An Example of a CPU Link Parameters Output in CSV Format ...
Page 79: ...This Page Intentionally Left Blank ...
Page 80: ...5 PROGRAMMING ...
Page 88: ...6 MAINTENANCE ...