-19-
After reassembly, install the battery and then check component operations as follows:
(1) Checking the direction of rotation
Press the (R) side of Pushing Button (A)
[32]
, and check that Drill Chuck 10MM
[2]
rotates in the
clockwise direction (when viewed from the rear of the main body).
(In case of reverse rotation, the soldered connections of the internal wires of Motor DC12V
[28]
and
DC-Speed Control Switch
[35]
are inverse.)
(2) Checking LED operation
Turn the trigger of DC-Speed Control Switch
[35]
on and off, and check that the LED goes on and off.
(The LED goes on when the trigger is turned on; the LED goes off when the trigger is turned off.)
(3) Checking shift knob operation
Set Shift Knob
[33]
to "HIGH" (high-speed rotation) and "LOW" (low-speed rotation), and check that
rotation speed is switched correctly without any abnormal noise being generated by the gears or other
parts.
x
Special Screw (Left Hand) (B) M5 X 25
[1]
------------------------------- 2.9 to 3.9N
•
m{30 to 40kgf
•
cm}
x
Drill Chuck 10MM
[2]
----------------------------------------------------------- 12.7 to 16.7N
•
m{130 to 170kgf
•
cm}
x
Tapping Screw (W/Flange) D3 X 16 (Black)
[38]
------------------------ 0.8 to 1.2N
•
m{8 to 12kgf
•
cm}
x
Machine Screw M3 X 8
[26]
-------------------------------------------------- 0.63 to 0.93N
•
m{6.5 to 9.5kgf
•
cm}
x
Screw Set D2 X 3.5
[17]
------------------------------------------------------- 0.3 to 0.5N
•
m{3 to 5kgf
•
cm}
2. Precautions on Disassembly and Reassembly of Battery Charger
For precaution on the disassembly and reassembly of the charger (Model UC 10SFL), and other charger-
related precautions, refer to the Service Manual for the Model UC 10SFL.
Screw tightening torques
Checks after reassembly