36
ED-X10/ED-X12(CC9XM2)
Wiring diagram 6
CN
CO
ZTP1
1
Control board
Control board
I/O metal
main board
main board
Dichroic optics unit
ZT
P11
CNCO
Preparation for attaching the main board
Wiring when attaching the control board.
(1)Attaching the control board to the I/O metal.
(2)Connect the main board and Control board by CNCO.
(3)Style and fix the CNCO.
Fasten the CNCO along the
control board by tape.
Prevention of hooking the CNCO.
Prevent hooking the CNCO to the Dichroic
optics unit when installing the main board.