35
ED-X10/ED-X12(CC9XM2)
Wiring diagram 5
E1
E3
ZTP6
FB6
ZTP7
CNRM
FB8
FB
7
CN
RM
FB
8
30±
10mm
FB
8
remote
board
CNR
M
ZTP1
2
ZTP7
FB7
E1
Remote board
FB
7
ZTP4
FB6
ZT
P6
Wiring of the fans
Assembly procedure of fan lead, E1, CNRM
Prepare the wiring of the fans before install-
ing the main board
(1)Attach the E1 to the FB7.
(2)Style the E1, FB7, panel sirocco. Setting
them by tape.
(3)Attach the FB8 to the CNRM. Connect the
CNRM to the remote board.
(4)Attach the remote board. Style the CNRM.
(5)Attach the FB6 to the E3.
(6)Style the E3 and lamp sirocco.
Attach the FB7(ferrite core) to the thermistor
E1 lead.
Attach the FB8(ferrite core) to the CNRM lead.
Make sure to completely lock the hook when
attaching the FB7 and FB8.
Attach the FB8 to the CNRM by ZTP12.
W
rap diagonally the tape to the FB8. Set the FB8
with both ends of tape.
See above diagram.
Attach the FB6(ferrite core) to the lamp sirocco lead.
Make sure to completely lock the hook when attaching the FB6.
Hang the E3 on the hook of Dichroic
optics unit.
Attach the E3 to the Dichroic optics
unit by tape(ZTP4).
Attach the FB6 in the corner of the
Dichroic optics unit by tape(ZTP6)
Style the E3 and lamp sirocco lead
internally to prevent the protruding.
Area of Importance
Area of Importance
Panel sirocco
Lamp sirocco
main board
Hook of the Dicroic optics unit
E3
Lamp sirocco fan lead
Set the FB6 in the corner of Dicroic optics unit by tape.
1.
Attach the FB7 to the E1. Hang
the E1 on the hook of duct.
2. Hang the sirocco fan lead on
the hook of duct.
Attach the
FB7 to the sirocco fan by tape.
This face is visible from outside.
Do not put the tape on this face.
3. Wire the CNRM passing under
the sirocco fan lead and E1.
hook of duct
hook of duct
V
iew from the side
Pass under the sirocco fan lead and E1.
duct
duct
fan duct
Little damage of the
wire is assumed to
be acceptable.
Little damage of the
wire is assumed to
be acceptable.
sirocco fan lead