Installation BAT-F
Release 06 02/2014
37
2.3.3
Grounding the device
The device is grounded via the separate ground screw.
Terminate the ground conductor between the fastening plates.
Make sure the fastening plates cover the insulated part of the ground
conductor completely.
Tightening the ground screw.
2.4
Installing an SFP transceiver (optional)
Before attaching an SFP transceiver, first remove the protective cap from
the SFP transceiver.
Push the SFP transceiver with the lock closed into the socket.
Note:
For this device, only use suitable SFP modules from Hirschmann.
See “Accessories” on page 68.
Note:
The SFP mounting tool available as an accessory makes it easier for
you to insert the SFP transceivers.
See “Removing an SFP transceiver (optional)” on page 51.
WARNING
ELECTRIC SHOCK
Ground the device before connecting any other cables.
Failure to follow these instructions can result in death, serious injury,
or equipment damage.
Summary of Contents for BAT-F
Page 72: ......