5.2 Use in North America
19
5 Installation
Version 1.0 03/06
5.3 Installation procedure
The RS 485 Fiberoptic Repeater OZD 485 G12 BAS is
installed by the following steps:
䊳
Installing repeater
䊳
Installing terminating resistors and (as long as the
device is located at the end of the line)
䊳
If necessary: Install pull-up/pull-down resistors (as
long as the device is located at the end of the line)
䊳
Connecting the optical bus cables
䊳
Connecting the electrical bus cables
䊳
Connecting the function ground
䊳
Connecting the operating voltage supply
䊳
Checking the LED indicators
5.2 Use in North America
Relevant information for North America:
䊳
Only for connection with a Class 2 power supply.
䊳
For use in Class 2 Circuits.
䊳
Use 60/75 or 75 °C copper(CU)wire only.
Summary of Contents for 943 893-321
Page 6: ...4 Version 1 0 03 06...
Page 8: ...6 Version 1 0 03 06...
Page 12: ...2 Half duplex operation 10 Version 1 0 03 06...
Page 14: ...3 Tristate recognition through permanent highHigh 12 Version 1 0 03 06...
Page 18: ...4 Network topologies Subkapitel 16 Version 1 0 03 06...
Page 26: ...5 Installation 24 Version 1 0 03 06...
Page 32: ...7 Help with problems 30 Version 1 0 03 06...
Page 35: ......