8
―――――――――――――――――――――――――――
Chapter 1
Product Outline
――――――――――――――――――――――――
A
Current
hour
1 hour/segment (bar graph)
min
1 minute/segment (bar graph)
Input over (bar graph)
⑬
Output terminal
Connected to the optional 9094 output cord to
provide output during a current measurement or a
frequency measurement in a current mode.
⑭
AC adapter connection terminal
Connected to the optional 9445-02 or 9445-03 AC
ADAPTER to perform measurements for no battery
or a long term measurement.
⑮
Voltage measurement terminal (V and COM
terminals)
Connected to the L9207-10 TEST LEAD (red and
black, supplied with the unit) to measure voltage.
⑯
Slide knob
Slide up to use the voltage measurement terminal or
slide down to use the output terminal or AC adapter
connection terminal. Move until a click is heard.
⑰
Back case
To replace the battery, remove the two screws.
⑱
Hand strap
Attach to get a better grip on the unit.
Summary of Contents for 3284 HiTester
Page 2: ......
Page 17: ...13 第1 章 製品概要 3284 1 3 各部の名称と機能 ...
Page 35: ...31 第2 章 測定方法 20 A 10 A 図2 出力応答波形 立上り 250 ms 出力波形 入力波形 500 ms 図3 出力応答波形 立下り 出力波形 入力波形 ...
Page 58: ...54 第4 章 電池の交換方法 ...
Page 60: ...56 第5 章 AC アダプタ 別売 の使用 ...
Page 61: ...57 第6 章 ハンドストラップの付け方 第 6 章 ハンドストラップの付け方 ハンドストラップを付けると操作性が増します ...
Page 62: ...58 第6 章 ハンドストラップの付け方 ...
Page 68: ...64 第7 章 故障とお考えになる前に ...
Page 70: ...66 第8 章 アフターサービス ...
Page 71: ...3284 ...
Page 72: ......
Page 73: ...3284 CLAMP ON AC DC HiTESTER INSTRUCTION MANUAL ...
Page 74: ......
Page 93: ...3 Chapter 1 Product Outline Top and Side View 1 3 Parts and Functions ...
Page 132: ...42 Chapter 2 Measurement Procedure ...
Page 144: ...54 Chapter 4 Battery Replacement ...
Page 148: ...58 Chapter 6 Attaching The Hand Strap ...
Page 156: ...66 Chapter 8 Service ...
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......