Benefits 

 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    

 

Hilti 
HIT-RE 100 
330 ml foil pack 

(also available 
as 500 ml 
and 1400 ml 
foil pack) 

-  suitable for concrete C 12/15 to 

C 50/60 

-  high loading capacity 

-  suitable for dry and water 

saturated concrete 

-  for rebar diameters up to 40 mm  

-  non corrosive to rebar elements  

-  long working time at elevated 

temperatures 

- suitable for embedment length till 

3200 mm 

 

Statik mixer 

 

Rebar 

 

 

Base material 

Load conditions 

 

 

 

 

 

 

 

Concrete 

Dry concrete 

Wet concrete 

Static/ 

quasi-static  

 

 

 

Installation conditions 

Other informations 

 

 

 

 

 

 

 

Hammer 

drilling 

Diamond 

coring

 

Compressed air 

drilling 

 

European 
Technical 

Approval 

CE 

conformity 

Corrosion 

tested

 

 

 

Service temperature range 

Temperature range: -40°C to +80°C (max. long term tempe50°C, max. short term tempe80°C). 
 

Approvals / certificates 

Description 

Authority / Laboratory 

No. / date of issue 

European technical assessment 

DIBt 

ETA 

– 15/0883 / 2016-04-21 

a)

  All data given in this section according to the approvals mentioned above ETA-15/0883 issue 2016-04-21  

 
 
 
 
 
 
 
 

 

Summary of Contents for HIT-RE 100

Page 1: ...suitable for embedment length till 3200 mm Statik mixer Rebar Base material Load conditions Concrete Dry concrete Wet concrete Static quasi static Installation conditions Other informations Hammer dri...

Page 2: ...6 Setting details For detailed information on installation see instruction for use given with the package of the product Curing time for general conditions 1 Data according ETA 15 0883 issue xxx Tempe...

Page 3: ...drill hole the drill hole shall be filled with mortar Drill the hole to the required embedment depth using a hammer drill with carbid drill bit set in rotation hammer mode a compressed air drill or a...

Page 4: ...essed air cleaning CAC For all drill hole diameters d0 and all drill hole depths h0 20 d Blow 2 times from the back of the hole if needed with nozzle extension over the whole length with oil free comp...

Page 5: ...DRS is recommended In addition for wet diamond corind DD For all drill hole diameters d0 and all drill hole depths h0 Flush 2 times by inserting a water hose water line pressure to the back of the ho...

Page 6: ...d above For each new foil pack a new mixing nozzle must be used Discard quantities are 3 strokes for 330 ml foil pack 4 strokes for 500 ml foil pack 65 ml for 1400 ml foil pack Inject adhesive Inject...

Page 7: ...ction Mark the required mortar level m and embedment depth v with tape or marker on the injection extension estimation lm 1 3 lv precise formula for optimum mortar volume lm lv 1 2 2 d0 2 0 2 For over...

Page 8: ...it from falling till mortar started to harden e g using wedges HIT OHW For overhead installation use piston plugs and fix embedded parts with e g wedges After installing the rebar the annular gap mus...

Page 9: ...Diamond coring Dry PCC Wet DD 8 12 10 a 12 10 a 10 14 12 a 14 12 a 12 16 14 a 17 16 14 a 14 18 17 18 16 20 20 20 18 22 22 22 20 25 24 b 26 25 22 28 28 28 24 32 32 35 32 25 32 30 b 32 30 b 35 32 26 35...

Page 10: ...ions multiply the values by 0 7 Bond strength in N mm according to ETA 15 0883 for good bond conditions diamond coring wet Rebar mm Concrete class C12 15 C16 20 C20 25 C25 30 C30 37 C35 45 C40 50 C45...

Page 11: ...22 C20 25 2 3 165 3 330 312 1040 728 22 C50 60 4 3 165 3 330 220 556 389 24 C20 25 2 3 196 6 360 340 1134 794 24 C50 60 4 3 196 6 360 240 607 425 25 C20 25 2 3 213 4 375 354 1181 827 25 C50 60 4 3 21...