41
AdaptaPAK® Installation
Set and Install Unit
A basic part of the installation process is setting the unit for the system. As part of this process, an adequate
number and type of vibration isolation units, or pads, should be installed to ensure that unit vibration is not
transmitted to the rest of the store through the building’s structure.
It is also quite important that the unit be installed such that it is level. Ensure that this occurs.
Set and Install Condensers, Cases, Walk-Ins and Walk-In Coils
Another basic part of the installation process is setting and installing condensers, cases, walk-ins and walk-in coils.
Install these components according to the customer and manufacturer specifications. The exact steps necessary
to complete the process may vary from manufacturer to manufacturer, so always make certain to follow the specific
steps provided by the manufacturer.
Choose and Install Lines for Circuit Piping
Considerations for circuit piping include checking for:
•
Pipe size
•
Insulation
•
Riser sizing
•
Hangers and clamps
•
Line slope and traps
•
Heat reclaim
•
Vibration elimination
•
Building penetrations
•
Condenser types (i.e., evaporative, air, plate-to-plate)
•
Split condensers
•
Opportunities to reduce piping through suction line sizing
Complete Individual Circuit Piping Inside Cases, Case-to-Case, Walk-Ins, and Gas Defrost
Keeping in mind that these considerations differ from those of general circuit piping considerations, as applied
specifically to inside cases, case-to-case piping, walk-ins and gas defrost:
•
Pipe size
•
Insulation
•
Ball valves
•
Check valves
Along with these considerations, drains for coils and cases and heat tape and insulation for drains subject to
freezing, must also be addressed.
Summary of Contents for Adaptapak ADP-M0000-L0032
Page 4: ...4 AdaptaPAK Parallel Refrigeration System ...
Page 20: ...20 AdaptaPAK Parallel Refrigeration System ...
Page 28: ...28 multiMAX Controller for AdaptaPAK ...
Page 66: ......