Heta SCAN-LINE 800 AQUA Operating Instructions Manual Download Page 6

6

Installation and Operating Instructions for Heta SL800 Aqua stove Pevex1018/AH/ver1:Jan 2013

3. With plenty of air the flames will burn 

brightly quickly warming the stove and 

chimney.

4. After about 5/10 minutes and with the 

fire established the door can be shut 

and the stove can be controlled by the 

airslider. Adjust the airslider to control 

the burning rate and to give optimum 

combustion.

5. After about 40/50 minutes and when 

the last flames go out a red hot ember 

bed will be left and further wood can be 

added.

6. Place 2/3 logs on the ash bed ensu-

ring that the wood is not stacked too 

closely and with the adjust the side 

airslider to fully on position. The wood 

will light in 2/3 minutes.  Adjust the air 

slider for optimum combustion.

Lighting instructions for Heta stoves

1. Place some scrunched up newspaper 

and firelighters on the base of the stove 

and stack some small pieces of wood/

kindling on top into about 3 layers lea-

ving gaps in between.

2. Fully open the ”side” air control. 

Light the firelighters and leave the door 

slightly ajar to allow air to enter and the 

fire to establish.

Summary of Contents for SCAN-LINE 800 AQUA

Page 1: ...ns for Heta SL800 Aqua stove Pevex1018 AH ver1 Jan 2013 www heta dk SCAN LINE 800 AQUA APPROVED FOR USE IN SMOKE CONTROL AREAS WHEN BURNING DRY WOOD LOGS OR AUTHORISED FUELS OPERATING INSTRUCTIONS GB...

Page 2: ...the floor area must match national and local regulations The chimney connection The chimney opening must follow national and local regulations Howe ver the area of the opening should of specifications...

Page 3: ...e weight of the chimney excessive weight may cause damage on or noise from the stove Draft conditions Poor draft may result in smoke being emitted from the stove when the door is opened The minimum ch...

Page 4: ...me correct firing prevents environ mental damage in the form of smoke and emmissions and also reduces the risk of chimney fires If the wood is wet and inadequately seasoned a large proportion of the e...

Page 5: ...top position fig 1 Reduce combu stion airflow gradually by lowering the handle When the handle is in the lowest position fig 2 combustion airflow is completely closed Fig 1 Fig 2 Open Closed The SL80...

Page 6: ...go out a red hot ember bed will be left and further wood can be added 6 Place 2 3 logs on the ash bed ensu ring that the wood is not stacked too closely and with the adjust the side airslider to fully...

Page 7: ...air controls or dampers left open except as directed in the instructions Refuelling A fresh supply of fuel should nor mally be added while there is still a good layer of hot embers Spread the embers...

Page 8: ...ary and se condary air in these instructions we call this combustion air The stove provides excellent heating efficiency and the window is easy to maintain as the secondary air flushes the surface of...

Page 9: ...ith wet wood In this case much of the heating energy is used to dry the wood resulting in poor heating eco nomics and an increased risk of soot deposits in the chimney OPERATIONAL PROBLEMS MAINTENANCE...

Page 10: ...the dealer Therefo re the stoves are guaranteed against defects in manufacturing FOR FIVE YEARS This guarantee does not cover Wea ring parts fragile parts such as The fire proof bricks in the combu s...

Page 11: ...ns for Heta SL800 Aqua stove Pevex1018 AH ver1 Jan 2013 Connection of external air flow fresh air through the floor on Scan Line 800 Aqua When connection external air flow use a 100 air conduit for in...

Page 12: ...Operating Instructions for Heta SL800 Aqua stove Pevex1018 AH ver1 Jan 2013 4 5 6 7 Emptying the ash pan fig 4 7 Cleaning after sweeping the chimney and replacing the stones Fig 8 14 Scan Line 800 Aqu...

Page 13: ...etween the cooling pipes lies as as sembled on the picture as when you receive it from Heta otherwise it will result in great loss of efficiency and raise the temperature of the chimney Tip the top pl...

Page 14: ...AH ver1 Jan 2013 Connection water to Scan Line 800 Aqua Fig 20 Bleed screw SYR Temperature valve pkt 5 Forward motion warm 1 2 RG point 4 12 mm copper pipe for water connection point 1 Return cold 1 2...

Page 15: ...sure The SYR valve point 5 is an extra safety device which opens by a tem perature over 95 in the boiler Connect cold water pressure on maxi mum 15 on the water connection point 1 make sure that your...

Page 16: ...d In Scotland and Wales this power rests with Ministers in the de volved administrations for those coun tries Separate legislation the Clean Appendix A Air Northern Ireland Order 1981 ap plies in Nort...

Reviews: