-
21
-
The timing requirements of GPS PPS and GPS Serial Data (NMEA) are shown below:
PPS cycle
t3 = 1 s ±50 μs (rising edge to rising edge)
PPS pulse width
t1 ≥ 1 ms (10 to 100 ms recommended)
Timing relationship
NMEA signal starts after the PPS rising edge of the current second, and ends after the PPS falling edge of the current
second, as shown by the gray arrows in figure above.
NMEA signal ends before the PPS rising edge of the next second; t2 ≥ 100 ms.
NMEA
PPS
1
0
t1
t2
t3
Summary of Contents for Pandar40M
Page 1: ...www hesaitech com HESAI Wechat Pandar40M 40 Channel Mechanical LiDAR User Manual...
Page 17: ...15 2 Setup 2 1 Mechanical Installation Figure 2 1 Front View Unit mm...
Page 18: ...16 Figure 2 2 Bottom View Unit mm...
Page 19: ...17 2 1 1 Quick Installation Figure 2 3 Quick Installation...
Page 20: ...18 2 1 2 Stable Installation Figure 2 4 Stable Installation...
Page 27: ...25 2 3 2 Connection Figure 2 10 Connection Box Connection with GPS...
Page 28: ...26 Figure 2 11 Connection Box Connection with PTP...