![Henny Penny EEG-16X Operator'S Manual Download Page 65](http://html1.mh-extra.com/html/henny-penny/eeg-16x/eeg-16x_operators-manual_2124320065.webp)
55
6
6))
Using a cloth or paper towel, clean each blower opening.
7
7))
Clean the vent slots on the inside of rear panel, and then replace panel.
8
8))
Reattach the gas line and turn the shut-off handle counter-clockwise to turn on
the gas and reconnect the cable restraint to the fryer.
9
9))
Reattach the plug to electrical receptacle and roll fryer back into place.
Summary of Contents for EEG-16X
Page 2: ......
Page 10: ...Preface viii...
Page 12: ...Introduction 2...
Page 22: ...Installation 12 Figure 2 3 2 Well Dimensions Figure 2 4 3 Well Dimensions...
Page 23: ...Installation 13 Figure 2 5 4 Well Dimensions...
Page 24: ...Installation 14...
Page 66: ...Operation 56...
Page 72: ...Information Mode 62...
Page 76: ...Product Program Mode 66...
Page 92: ...Troubleshooting 82...
Page 93: ...blank page...