Issued September 2017
Preventive Maintenance Chart
Copyright 2017, Heil Environmental
Printed in U.S.A.
150
DuraPack
®
5000
BODY PREVENTIVE MAINTENANCE CHART
Preventive maintenance must be performed to ensure the safe and reliable operation of your unit. Use the chart below as a
guideline for when essential items should be checked and serviced.
*HOURS OF OPERATION
COMPONENT/SYSTEM
8
40
200
1000
2000
CHECK/SERVICE
Hydraulic System
Check oil level – add if necessary
Check cylinders, pump, hoses, tubes,
fittings, and adapters for leaks.
Check hoses for cracks, crushes, and cover
blisters. Repair or replace if necessary with
genuine Heil parts.
Any replacement hose should be the same
size and pressure rating as listed on the
original OEM hose.
Check Control valve seals for leaks.
Repair or replace if necessary.
Replace filter after first 30 days of operation,
then every 6 months or 1000 hours of
operation OR when filter bypass light is ON.
Replace tank breather filter every time you
replace filter element.
Drain, flush, and refill.
Change filter element.
Electrical, Battery Cables
Check for proper operation.
Check battery cables from battery to starter
for loose cables, rubbing or damage and
abrasions to cables.
Replace if necessary.
Summary of Contents for DuraPack 5000 2017
Page 10: ...NOTES DuraPack 5000 2...
Page 36: ...NOTES DuraPack 5000 28...
Page 64: ...NOTES DuraPack 5000 56...
Page 68: ...NOTES DuraPack 5000 60...
Page 86: ...NOTES DuraPack 5000 78...
Page 104: ...NOTES DuraPack 5000 96...
Page 114: ...NOTES DuraPack 5000 106...
Page 152: ...NOTES DuraPack 5000 144...
Page 156: ...NOTES DuraPack 5000 148...
Page 160: ...NOTES DuraPack 5000 152...
Page 164: ...NOTES DuraPack 5000 156...
Page 202: ...NOTES DuraPack 5000 194...