background image

3

196349 rev 1

EN

fi re hazard. Furthermore, this will reduce the lifetime of 
the dryer. Allow for sufficient cooling time of the dryer. 
The distance to the object that is to be dried must be suf-
ficient. Otherwise there is risk for fire or explosion! 

Keep all flammable materials in a sufficient distance 

from the hot surfaces of the dryer.

The dryer is only to be moved when the platform is
completely lowered (see 1.4 Hazards).

Nobody and no objects are to be on the mobile
dryer whilst it is being moved.

The dryer must always be monitored by the operator
for the entire duration of the moving, lifting or lower-
ing process.

Parts such as the hoses or air bellows must be protect-
ed from damage when working in conditions where
high heat is generated (welding, grinding, etc.).

Abiding by the following regulations is particularly 

emphasized:

The instructions in the operating manual must be fol-
lowed whenever the dryer is operated.

Independent operation is only to be undertaken by
a person who is older than 18 and has been trained
in the operation of the dryer.

The dryer is only to be moved when it is in the start
position (completely lowered) and without anybody
or any load on it.

Ensure stability and keep sufficient distance from
objects, walls and ceilings! The maximum permis-
sible gradient is 2.5% (1/40, corresponding to 2.5
cm per 100 cm).

The dryer must be monitored by the operator during
the entire lifting or lowering process.

Nobody is to stand under the load lifting handling
attachments or in the pivot area of the scissors.

This dryer is for indoor use only. Outdoor installation
is not allowed!

The dryer must be inspected by a specialist after
any modifications have been made to the structure
and after maintenance has been carried out on the
load-bearing parts. Modifications and repairs must
be recorded in the master data sheet.

Climbing on the dryer is prohibited.

The dryer must not be used as a hoist or a crane.

1.4  Hazards

Tilting

The risks for tilting increases when the platform is in el-
evated position do not transport the mobile dryer unless 
its platform is lowered completely. Small adjustments in 
length and sideways can be made in elevated positions 
to get the green lights from the distance indicators. All 
movements of the IRT Siemens Leading Edge Protection 
Dryer are to be made with help of the four handle bars 
one at each corner at the base. No adjustments or move-
ment of the dryer are to be made by applying force to 
the scissor/lifting part of the mobile dryer or frame with 
the IR heaters mounted on the lifting platform.

1. Safety instructions

1.1  Operator´s duty of care

The IRT Siemens Leading Edge Protection Dryer is 
designed and built after a hazard assessment was con-
sidered and following careful selection of the required 
harmonized standards as well as additional technical 
specifications. It corresponds to the current state of tech-
nology and guarantees the highest safety level.
However, this safety level can only be reached during 
practical operation, when all the required measures have 
been implemented. Due diligence is required on the 
part of the platform operator, to plan these measures 
and ensure their implementation.

In particular, the operator must always ensure that:

the dryer is only used for the intended purpose.

the dryer is only to be used in a fully functional and
fault-free state and it is to be checked regularly for
operational functionality with special attention paid
to the safety equipment.

persons are prevented from entering the hazardous
area (space under the IR platform). Maintenance
work is excepted.

the operating instructions must always be fully leg-
ible and available at the dryer operational site.

the dryer is only used by individuals who have read
and understood the operating manual.

only adequately qualified and authorized personnel
are allowed to operate, maintain or repair the dryer.

none of the safety and warning labels on the dryer are
to be removed and all of them must always be legible.

the personnel are to be regularly instructed in all
relevant questions regarding work safety, environ-
mental protection and the operating manual and
especially the safety instructions contained therein.

the heater platform must be lowered into its start
position after you have finished working with it.

1.2  Task of the operator

Certain measures are included in the Industrial Safety 
Regulations for operators using working equipment in 
hazardous areas.
The operator must conduct a risk assessment of the area 
in which the working equipment (working platform) is 
to be deployed. The hazardous situations that can be 
caused when using the working equipment in conjunc-
tion with the working materials and the working environ-
ment should be recognized and addressed.
The operator must implement the required measures 
and select the equipment which is appropriate for the 
given workplace conditions and which, if used for its 
intended purpose, offer the necessary protection as 
regards health and safety.
The operator must apply national directives and stan-
dards when conducting the risk assessment and choos-
ing the appropriate equipment.

1.3  Basic safety measures

The IRT Siemens Leading Edge Protection Dryer must not 
be exposed to paint fog, sanding dust or solvents, due to 

Summary of Contents for IRT System Series

Page 1: ...196349 rev 1 Hedson Technologies AB 2018 IRT Dryer Siemens Leading Edge Protection EN Operation Manual original language...

Page 2: ...wner 5 5 Assembly instruction 5 6 Basic instruction for operation 5 7 Program mode 8 8 Extended usage information 9 9 Settings mode 9 10 Maintenance and Service 12 11 Spare parts 14 12 Safety inspecti...

Page 3: ...ounted on the lifting platform 1 Safety instructions 1 1 Operator s duty of care The IRT Siemens Leading Edge Protection Dryer is designed and built after a hazard assessment was con sidered and follo...

Page 4: ...king under the raised working platform and during its lifting and lowering movements is not permitted 3 Product description The IRT Siemens Leading Edge Protection Dryer is a maneuverable infrared dry...

Page 5: ...ir only A filter regulator must only be installed in the air supply line air filter and water separator 6 Basic instruction for operation Move the dryer to the site where you want to use it This can o...

Page 6: ...amps Control panel 1 The lights turn green when the correct distance obtained between IR lamps and object This distance must be checked before the IR lights turned on During operation with IR lamps th...

Page 7: ...ered This is normally not a part of the everyday usage To enter the settings mode press both arrow keys when you turn the main switch to position 1 Read chapter 9 for more information 6 8 Program inte...

Page 8: ...is finished If this happens check the cooling system of the con trol unit fan filter or ambient temperature 3 Paint Temperature Alarm Also called Process alarm see 8 2 Option if pyrometer is used 4 Fi...

Page 9: ...ram is terminated In case of process alarm check if the temperature measuring device pyrometer is aligned correctly on the surface to be dried and that it is not registering unwanted material temperat...

Page 10: ...o select no yes Press select to confirm 9 4 6 7 Basic PIN Code You can change the PIN code to prevent unauthor ized access to the basic setting as described in table in chapter 9 4 To do this use the...

Page 11: ...t 4 Cassette IR Test The IR cassette lamps output I light up Check that all the IR lamps are lit For safety reasons this test is limited to 10 seconds Press enter or next to continue Test 5 Ventilator...

Page 12: ...uitably trained personnel Do not use running water or flammable liquids for clean ing Abide by the following points to ensure a long service life and continuous operation of the dryer Only original sp...

Page 13: ...round the lamp until the fit ting is completed 1 Loosen the mounting screws on both end cov ers 2 Loosen both lamp end protections 3 Pull the protection out of the slide The screws for the lamp holder...

Page 14: ...st environmental pro tection facility for recycling 11 Spare parts The following spare parts are the most common ones for the SingleHeater IR units Part Part nr 1 Fan 202024 2 Filter 103055 3 IR lamp...

Page 15: ...s to the zero position when released Fall arrester function Emergency release status Air bellows status Supporting structure status Function test Lifting lowering Function test Lifting lowering with l...

Page 16: ...lowing standard s or other normative document s EN 61000 6 4 Electromagnetic Compatibility Generic Emission Standard EN 61000 6 3 Electromagnetic Compatibility Generic Immunity Standard EN 60204 1 Saf...

Page 17: ...appendix 1 761 054_PNTS 77 Electrical diagram for IRT Siemens Leading Edge Protection Dryer equipment is found in the appendix 2 15 Weights and Dimensions The overall weight is 665 kg Dimensions as b...

Page 18: ...sette tripped Check fans filters hoses and ambient tempera ture Reset by pressing the temp switch button Lifting malfunction Maintenance unit manometer without mains pressure Ensure the mains pressure...

Page 19: ...70 196349 rev 1...

Page 20: ...53 42 00 Telefax 46 0 40 43 29 01 www hedson com HEDSON TECHNOLOGIES AB Box 1530 SE 462 28 V nersborg Tel 46 0 40 53 42 00 Telefax 46 0 521 669 09 www hedson com Hedson Technologies 2017 The manufact...

Reviews: