®
Heat
Link
www.heatlinkgroup.com
4
TWH – Tankless Water Heater Panels
Installation, Operation, and Maintenance
Unpacking
Step 1
Examine carton for any damage that may have occurred during shipping. If damage is visible notify your courier and
supplier immediately.
Step 2
Open the carton by removing the staples.
Step 3
Remove the cardboard spacers from the carton, then remove the panel from the carton. Lift the panel by the base,
not the enclosure.
Step 4
There are 2 screws holding the enclosure in place during shipping. They are located at the top left & right of the panel
base. Remove these 2 screws.
Step 5
Remove the enclosure from the panel by sliding it upwards until it stops, then gently pulling outwards off .
Function
This panel can provide mixing, distribution, and zoning for a wide variety of hydronic heating applications.
The eff ectiveness of the system is dependant on the system being designed and installed correctly. Proper consideration
of factors such as BTU loads, outdoor design temperature, indoor design temperature, room set-point temperature(s),
diff erential fl uid temperatures, head loss, fl ow rates, and transfer capacities of the heat emitters is critical.
Once these factors have been considered and the system requirements determined, these can then be evaluated and
compared to the zone control panel capabilities (refer to pages 5-9).
Note:
This panel does not regulate or monitor the operating safety limit temperatures of the fl uid leaving the heat source.
Step 6
Verify the following items:
• (4) Mounting screws
• (4) ¾" MBSP x 1" FNPT adapters
• (6) ¾" rubber washers (2 spares)
• (2) 1" rubber washers (spares)
Screws
Top
Side View
Bottom