®
Heat
Link
www.heatlinkgroup.com
10
TWH – Tankless Water Heater Panels
Installation, Operation, and Maintenance
Mounting
Prior to mounting the panel, ensure the wall is capable
of supporting the weight of the panel.
Ensure that a 115V receptacle is within reach of the
6-foot cord and plug.
Step 1
Determine the locations and distance
between the wall studs. With a level at a
minimum height of 4' from the fl oor draw a
straight line on the wall and mark the stud
locations.
If the panel cannot be secured directly to the
studs, or suitable backing boards, plywood
may need to be installed behind the panel to
properly secure it in place.
Step 2
Screw two of the supplied mounting screws
into the wall studs (or backing plywood) 2"
from the top of desired height, and 10-½"
apart, leaving ¼" of screw out from the wall.
Step 3
Lift and place the panel onto the mounting
screws.
Step 4
Screw the two remaining mounting screws
into the holes at the bottom of the panel and
tighten the top two screws.
Step 5
Before replacing the enclosure, refer to pages
12-14 for fi ll and purge, and proper wiring
instructions.
10-½"
2"
1
⁄
4
"
Wall Stud
min. 4'
from fl oor