27
www
.heatlinkgroup.com
1-
866-
661-5
332
Note
s:
Dr
awing
s ar
e
for
Hea
tLink
sugg
este
d e
lectr
ical sche
m
atics o
n
ly! User
m
u
st
de
term
in
e if el
ectrica
l sch
em
atic wil
l wo
rk
fo
r t
he
ir
p
a
rt
ic
u
lar
a
p
pli
ca
tio
n
. Use
r
mu
st also
con
fir
m a
ll He
atLin
k sche
m
at
ics with man
u
fa
cture
r sch
ematics o
f e
a
ch
pa
rticula
r co
ntrol ch
ose
n
.
In
a
ll ca
ses ma
nuf
actu
re
r
equ
ip
ment
sche
m
at
ics wi
ll ta
ke p
re
ced
ence
ove
r
Hea
tL
in
k e
lec
tr
ic
al
s
ch
e
m
at
ic
s.
Lo
ca
l code
s, r
e
gu
la
tio
n
s, a
n
d auth
or
ities
ha
ve final jurisdictio
n
.
Application:
Schematic #:
Date:
Hea
t
So
urc
e
2
4
4
4
4
4
2
2
2
Mechanical R
oom
Manifold #1 Location
Ma
nifo
ld #
2 Location
SCH-
MRIB-
R
002
1
1
3
1
Roo
m
T
h
erm
o
s
tats
Standar
d 4-w
ire
to be
run fr
om each zone ba
ck
to the
cor
respon
ding
manifold
location.
2
Op
tio
nal
Allow fo
r 110V p
ower
sou
rce to a 24
V transfor
mer at e
ach
manifold
location instead
of supplying 24
V power from t
he mechanical room.
3
6-wire Ju
mp
er
6-w
ire
to be r
un betw
een ea
ch ma
nifo
ld location. Th
is allo
ws
for the
transfer
of the
clock signal, heat d
emand infor
m
ation,
and
power
from mo
dule to modu
le.
6-wire Ju
mp
er
6-w
ire to be run from the last manifold lo
cation to
the mechanical room. T
his allows
for th
e transfer
of the clock signal, heat de
mand inform
ation
, and po
wer.
201
2-10-
19
Rou
gh-in Wiring for
Multiple Zo
ne Hea
ting
wit
h
StatLink
6
2
4
4
4
2
2
Flo
or Sen
sor (o
pt
ion
al)
Standar
d 2-w
ire
to be
run fr
om ther
mostat to floor
sen
sor
.
5
5
5
6