08-03
20356 Rev R
35
G136 SERIES INSTALLATION INSTRUCTIONS
Index
A
Accessories 32
Air Kit 18
Assembling Vent Sections 12
B
BTUs 8
Building Codes 4, 13
Burner and Control Compartment
Cleaning 26
C
Ceiling 12
Certification 4
Chase Top 13
Clearances 9
Codes 4
Building 4, 13
Electric 16
Gas 4, 8
Combustible Materials 10
Control Arm 18
Conversion Kits 4, 32
Conversions
Gas 4
D
Damper 18
Dimensions 6
Door Clip Covers 20
E
Elbows, Using 12
Electric Codes 16
Electronic Ignition 16, 22
Operation 25
Replacement Parts 30
Trouble Shooting 28
Exit Point (though the roof) 12
F
Finishing Materials 10
Firestop Spacers 12
Flame Patterns
Checking 26
Flexible Duct 19
Framing 9
Fuel 4
Fuel Conversions 4
G
Gas Codes 4, 8
Gas Conversions 4
Gas Line 15
Installation 14
Gas Pressure 8
Glass Door Installation 20
Glass Doors
Breakage & Cleaning 27
Door Clip Covers 20
Leveling 20
Operation & Position 26
Pivot Brackets 20
Positioning 20
Top Door Support 20
H
Header Height 9
High Altitude Installation 8
High Limit Safety Switch 27
High Temperature Sealant 10
I
Ignition
Determining Type 21
Installation of the System 11
J
Junction Box Installation 17
L
Lava Rock 19
Lighting Instructions 21
Location Requirements 8
Logs 19
Cleaning 26
M
Maintenance Instructions 26
Mantel 9, 19
Massachusetts 14
Minimum Height of Vent Installation
11
N
Nailing Flanges 11
Noncombustible Material 10
O
Operating Instructions 21
Optional components 5
Outside Air Kit 18
P
Pivot Brackets 20
Preparation 8
Pressure Testing 2
R
Red Ignitor Button 24
Remote Control 32
Replacement Parts 30
Rock Wool 20
Roof Flashing 13
S
Safety Precautions 2
Space Requirements 8
Standing Pilot Ignition 17, 21
Operation 24
Replacement Parts 31
Trouble Shooting 29
T
Termination Cap 13
Minimum Height 13
Unlisted Cap 13
Top Door Support 20
Trouble Shooting 28
U
Uniform Building Code 13
V
Vent
Checking 14
Minimum Installation Height 11
System Inspection 26
Vent, Securing 12
Ventilation
Testing 14
Venting 11
W
Wiring
Electronic Ignition 16
Junction Box 17
Standing Pilot Ignition 17