01/04
23
CALIBER DESIGNER SERIES
Index
A
Air Clearances 8
Air Kit
Installation 9
Operation 18
Air Kit Handle 18
Air Shutter 19
Appliance Locations 6
Appliance Preparation 13
B
BTUs 10
Building Codes 4
Burner and Control Compartment 19
C
Certification 4
Chase Installation 9
Cleaning
Burner & Control Compartment 19
Glass 20
Clearances 6
Codes
Building 4
Electric 11
Gas 4, 10
Combustible Mantel 13
Combustible Material 13
Control Access Panel Removal 10
Conversion Kit 21
Conversions 11, 18
D
Dimensions 5
E
Electric Codes 11
F
Finishing
Combustible Mantel 13
Combustible Materials 13
High Temperature Sealant 13
Noncombustible Material 13
Firestop Spacer 8
Flame Sensor 19
Flames
Checking the Patterns 19
Fuel 11, 18
Fuel Conversions 11, 18
G
Gas Codes 4, 10
Gas Line Connection 10
Glass
Certification 4
Cleaning 20
Specifications 4
Grounding 11
H
High Altitude Installation 6
High Temperature Sealant 13
Hood 13
I
Input Rate 9, 10
Intermittent Pilot Ignition 11, 15, 17
J
Junction Box Installation 12
L
Lava Rock 14
Lighting Instructions 17
Standing Pilot Ignition 16
Locations 6
Log Set 13, 20
Removal/Replacement 20
M
Mantel 13
N
Nailing Flanges 7
Nomenclature 5
Noncombustible Material 13
O
Outside Air Kit 9
Installation 9
Operation 18
R
Rock Wool 14
S
Safety Precautions 2
Sealant Material 13
Space Requirements 6
Standing Pilot Ignition 12, 16
T
Termination Installation 9
Testing Ventilation 9
V
Venting
Checking the System 9, 19
System Inspection 20
Testing the System 9
Vent System Maintenance 19
Vermiculite 14
Vertical Termination 8
Chase Installation 9
Clearances 8
Firestop Spacer 8
Firestop Spacer Installation 8
Termination Installation 9
Vent Height 9
Vent Installation 8
Vent Lengths 8
Volume 6
W
Water Damage 17
Wiring 11
Intermittent Pilot Ignition 11
Standing Pilot Ignition 11, 12
Æ
Æ