Assemble the Storm Shell Front
5. Place the Storm Shell Front left part and right part together. Connect the two parts together
using the Top Connecting Bar with two (2) S2 bolts. The S2 bolts are placed through the Storm
Shell Front top plastic and secured into the threaded holes in the Top Connecting Bar. Next, attach
the Bottom Connecting Bar using four (4) S2 bolts. Again, the bolts are placed through the plastic
and secured into the threaded hole in the Bottom Connecting Bar. Bolts heads should be on the
outside and the connecting bars should be on the inside. Figure 6.
Figure 6
6. Install the Middle Connecting Plate. The bent hook of the Middle Connecting Plate is placed
on the top of the Storm Shell Front and the Middle Connecting Plate is placed on the front of the
Storm Shell Front. The threaded bolts on the Middle Connecting Plate will penetrate the plastic
holes in the Storm Shell Front.
Connect the top of the Middle Connecting Plate to the Storm Shell Front using two (2) S2 bolts.
Secure the Middle Connecting Plate to the Storm Shell Back using twelve (12) N2 Flange Nuts. See
Figure 7 and Figure 8.
Bolts:
S2- M4X8 screw: 6pcs