11
Heat & Glo • RED40, RED40ST Installation Manual • 2155-980 Rev. C • 11/13
Figure 3.7. Clearances to Combustibles-RED40ST
MINIMUM FRAMING DIMENSIONS*
A
B
C
D
E
F
G
H
I
Rough
Opening
(Vent Pipe)
Rough
Opening
(Height)
Rough
Opening
(Depth)
Rough
Opening
(Width)
Clearance
to Ceiling
Combustible
Floor
Combustible
Flooring
Sides of
Appliance
Front or
Rear of
Appliance
Inches
10
46-3/4
17-1/4
50-1/4
31
0
0
1
36
Millimeters
254
1187
438
1276
787
0
0
25
914
F
I
G
H
E
MEASURE FROM TOP OF
FIREPLACE OPENING
C
A
B
D
C
B
D
A
Figure 3.6. Clearances to Combustibles-RED40
MINIMUM FRAMING DIMENSIONS*
A
B
C
D
E
F
G
H
I
J
Rough
Opening
(Vent Pipe)
Rough
Opening
(Height)
Rough
Opening
(Depth)
Rough
Opening
(Width)
Clearance
to Ceiling
Combustible
Floor
Combustible
Flooring
Behind
Appliance
Sides of
Appliance
Front of
Appliance
Inches
10
46-3/4
18-1/4
50-1/4
31
0
0
1
1
36
Millimeters
254
1187
464
1276
787
0
0
25
25
914
F
J
G
I
H
E
MEASURE FROM TOP OF
FIREPLACE OPENING