background image

6

WALL PANEL & DOORS PARTS LIST

x3

BOXES

x3

BOXES

NAIL BOXES

FASTENER / HARDWARE BAG

x1

3/8" x 48" x 96"

(1 x 121,9x 243,8 cm)

        

 x1

3/8" x 48" x 96"

(1 x 121,9x 243,8 cm)

x3

3/8" x 48 x 76"

(1 x 113,3 x 193 cm)

x1

3/8" x 48" x 84"

(1 x 122 x 213,4 cm)

x1

3/8" x 42" x 96"

(1 x 106,7 x 243,8 cm)

x1

3/8" x 42" x 96"

(1 x 106,7 x 243,8 cm)

x1

3/8" x 48" x 84"

(1 x 122 x 213,4 cm)

x1

3/8" x 4-1/2" x 48" 

(1 x 11,4 x 121,9 cm)

x1

3/8" x 10-7/16" x 48" 

(1 x 26,5 x 121,9 cm)

x1

Right Door

x230

2" (5,1 cm)

3" (7,6 cm)

x100
x2

x90

x100

3/4" (1,9 cm)

2" (5,0 cm)

3" (7,6 cm)

2" (5,1 cm)

x265

1-1/2" (3,8 cm)

NOTE:

If you are using a nail gun, nails may

be used where screws are shown for 

quicker assembly.

Length of nail must match screw length.

x1

Left Door

1-1/4" (3,2 cm)

Summary of Contents for SOHO MODERN

Page 1: ...oduct information call our toll free number 1 800 827 9056 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST 16196 A ...

Page 2: ... This page is intentionally left blank ...

Page 3: ...ment and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 8 CHECK ALL PARTS Inventory all pa...

Page 4: ...nstallation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk Gun Hammer Leve...

Page 5: ...243 8 cm 5 8 x 48 x 90 1 6 x 1221 x 228 6 cm x10 x3 x10 x2 x40 x186 x1 x1 ADDITIONAL MATERIALS FOR BUILDING YOUR SHED 3 TAB SHINGLES 5 Bundles PAINT FOR SIDING 2 Gallons Use 100 acrylic latex exterior paint 2 coats recommended CAULK 2 Tubes Use acrylic latex exterior caulk that is paintable 1 GALVANIZED ROOFING NAILS 3 Lbs For shingles PAINT FOR TRIM 1 Quart Use 100 acrylic latex exterior paint 1 ...

Page 6: ...x11 2 x 4 x 92 3 16 1 5 x 10 2 x 234 2 cm SDC x4 TP 2 x 4 x 96 5 1 x 10 2 x 243 8 cm x1 PT 2 x 3 x 96 5 1 x 7 6 x 243 8 cm x2 2 x 4 x 72 5 1 x 10 2 x 182 9 cm TM x1 3 8 x 1 1 2 x 9 0 9 x 3 8 x 22 9 cm x1 3 8 x 2 11 16 x 12 1 4 1 5 x 6 8 x 31 1 cm Left Green x1 3 8 x 2 11 16 x 12 1 4 1 5 x 6 8 x 31 1 cm Right Red x2 19 32 x 2 1 2 x 55 1 8 5 1 x 7 6 x 150 5 cm FDA 4 x2 7 16 x 3 1 4 X 66 3 4 1 1 x 8 ...

Page 7: ...1 19 32 x 3 1 2 x 60 1 2 1 5 x 8 8 x 153 7 cm WAB x1 19 32 x 3 1 2 x 61 1 16 1 5 x 8 8 x 155 1 cm UDR x1 19 32 x 3 1 2 x 61 1 16 1 5 x 8 8 x 155 1 cm UDL x2 19 32 x 3 1 2 x 45 1 5 x 8 8 x 114 3 cm WQA x4 19 32 x 2 1 2 x 58 3 4 1 5 x 6 3 x 149 2 cm TTB x1 19 32 x 2 x 72 1 5 x 5 1 x 182 9 cm OWB x2 OO 69 75 3 cm Door Stiffener x1 19 32 x 3 1 2 x 59 1 4 1 5 x 8 8 x 150 4 cm HBA 5 NOTE Panel parts are...

Page 8: ...1 x 106 7 x 243 8 cm x1 3 8 x 42 x 96 1 x 106 7 x 243 8 cm x1 3 8 x 48 x 84 1 x 122 x 213 4 cm x1 3 8 x 4 1 2 x 48 1 x 11 4 x 121 9 cm x1 3 8 x 10 7 16 x 48 1 x 26 5 x 121 9 cm x1 Right Door x230 2 5 1 cm 3 7 6 cm x100 x2 x90 x100 3 4 1 9 cm 2 5 0 cm 3 7 6 cm 2 5 1 cm x265 1 1 2 3 8 cm NOTE If you are using a nail gun nails may be used where screws are shown for quicker assembly Length of nail mus...

Page 9: ...WS Misc DOOR HARDWARE x2 8 x 16 20 3 x 35 6 cm 1 2 1 2 cm x12 x1 64 Metal Threshold Bagged separately special coating 3 4 1 9 cm x11 x4 Window x11 H 2 5 Tie Plate x2 Spring Bolt x8 1 1 4 3 2 cm x1 x2 1 1 2 3 8 cm NOTES ...

Page 10: ...ding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUIRED x2 4 x 4 x 12 10 x 10 x 365 8 cm Treated Lumber Fasteners for Frame to 4x4 3 Screws shown as one option Minimum 40 3 screws exterior grade Use only wood treated for ground contact and fasteners approved for use with tr...

Page 11: ...ill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at least seven 7 days 2 x 4 x 12 0 5 1 x 10 2 x 365 8 cm 2 x 4 x 8 0 5 1 x 10 2 x 229 6 cm Caulk Requires x2 x2 x1 MUST be treated lumber MUST be treated lumber 144 365 8 cm 144 x 90 365 8 x...

Page 12: ...easier nailing stand on frame 1 Orient parts as shown on flat surface Measure and mark Secure with 2 3 nails at each mark BEGIN Your floor frame is now assembled Proceed to level and square frame FINISH Flush Flush Flush Flush 48 121 9 cm 32 81 3 cm 16 40 6 cm 1 1 2 3 8 cm 64 162 6 cm 80 203 2 cm 90 228 6 cm 87 221 cm 96 243 8 cm 112 284 5 cm 128 325 1 cm 144 365 8 cm 144 365 8 cm ...

Page 13: ...l measurement will be approximately 169 13 16 431 3 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the frame to 4x4 runners using one fastener at ends of each runner making sure the frame remains square Fig A Once the floor frame is level and square fasten the frame to the 4x4 ...

Page 14: ...EGIN 1 3 Continue securing the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel Fig A PARTS REQUIRED x1 x53 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm 2 5 1 cm Flush Flush 2 Nails FLOOR PANELS 3 4 1 9 cm Fig B Flush 3 4 1 9 cm Install the 48 x 96 panel with the 48 edge and corner flush to the floor frame Fig A Secure panel with 2 2 nails in the corners DOOR 2 Nails Install all panels...

Page 15: ...REQUIRED FINISH Your floor panels are now installed Continue installing panels with 2 nails spaced 6 apart on edges and 12 apart inside panels 4 x1 x1 x115 5 8 x 48 x 90 1 6 x 60 6 x 122 cm 5 8 x 42 x 96 1 6 x 106 7 x 243 8 cm 2 5 1 cm FLOOR PANELS Flush Flush DOOR Flush Flush ...

Page 16: ...frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls DOOR ...

Page 17: ...7 cm UM x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x32 15 3 7 6 cm BEGIN 1 Secure with 2 3 nails at each mark and 4 3 nails at seams Orient parts on edge on floor Measure and mark 2 UM x7 TP SP SP TP 144 365 8 cm 120 304 8 cm 68 172 7 cm 1 1 2 3 8cm 96 243 8 cm 96 243 8 cm 48 122 cm 72 182 9 cm 48 122 cm 24 61 cm 96 243 8 cm SEAM 3 7 6 cm Nails ...

Page 18: ...the wall stud Secure panel using 2 nails spaced 6 apart on edges and 12 apart inside panel 3 3 4 GAUGE BLOCK GAA For squareness maintain 3 4 measurement along panel edges BEGIN HERE 3 4 GAUGE BLOCK Ensure top of panel is overhanging the top of frame by 4 6 15 2 cm 4 10 2 cm 3 4 1 9 cm 3 4 1 9 cm 48 121 9 cm 12 30 5 cm Install all panels with the primed side facing up ...

Page 19: ...B Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel 4 Your back wall is now assembled FINISH 48 x 76 121 9 x 193 cm x2 BACK WALL PANELS PARTS REQUIRED x90 2 5 1 cm Carefully flip the back wall over 3 4 GAUGE BLOCK GAA 3 4 GAUGE BLOCK Flush Fig A Fig B For squareness maintain 3 4 measurement along panel edges For squareness maintain flush along panel edges ...

Page 20: ...Center OSB Build header assembly as shown using 3 and 2 nails Flush Flush 3 1 4 x 66 3 4 OSB 3 1 4 x 66 3 4 OSB x2 7 16 x 3 1 4 x 66 3 4 1 1 x 8 3 x 169 5 cm OSB x2 2 x 4 x 67 5 1 x 10 2 x 170 2 cm AM Your door header is now assembled FINISH x6 2 5 1 cm 3 7 6 cm Nails 2 5 1 cm Nails ...

Page 21: ...IRED HINT For easier nailing stand on frame x2 2 x 4 x 72 5 1 x 10 2 x 182 9 cm TM x2 2 x 4 x 70 1 2 5 1 x 10 2 x 179 1 cm AYA x4 2 x 4 x 72 1 2 5 1 x 10 2 x 184 2 cm PTA x2 2 x 4 x 86 1 8 5 1 x 10 2 x 218 8 cm OHB 2 x 4 x 40 5 1 x 10 2 x 101 6 cm x2 SKA 2 x 4 x 12 1 8 5 1 x 10 2 x 30 8 cm x5 PPA x56 3 7 6 cm BEGIN 1 Secure with 2 3 nails at each mark and 4 3 nails at seams Orient parts on edge on...

Page 22: ...ure with 2 3 nails at locations shown Secure with 4 3 nails into each side of header Install door header with OSB to the top of header Secure header with 3 nails at locations shown 3 4 FRONT WALL FRAME x56 3 7 6 cm PARTS REQUIRED x2 2 x 4 x 68 9 16 5 1 x 10 2 x 174 1 cm NCE x1 4 x 67 170 2 cm Pre Assembled Door Header Door Header OSB ...

Page 23: ...bove top plate Secure panel with 2 nails spaced 6 apart along edges and 12 apart on inside of panels There will be a 5 7 8 reveal at the top BEGIN 1 FRONT PANELS ARE FRAGILE UNTIL INSTALLED HANDLE CAREFULLY TO AVOID BREAKING AT CORNERS AND EDGES BEGIN HERE Flush Flush 6 15 2 cm 12 30 5 cm Flush Flush 5 7 8 14 9 cm Install all panels with the primed side facing up ...

Page 24: ...9 2 5 1 cm Install panels in the following order 1 10 7 16 x 48 2 1 1 2 x 9 3 4 1 2 x 48 Secure panels with 2 nails spaced 6 apart There will be a 5 7 8 reveal at the top of upper panel 2 10 7 16 x 48 1 1 2 x 9 Filler 4 1 2 x 48 Flush Flush Flush Flush Center x1 3 8 x 1 1 2 x 9 1 x 3 8 x 22 9 cm 5 7 8 14 9 cm BEGIN HERE ...

Page 25: ...3 screws MAINTAIN 64 DIMENSION BETWEEN STUDS Carefully flip the front wall over 4 Install 2nd 48 x 96 panel flush to frame as shown and 5 7 8 from the top Secure panel using 2 nails spaced 6 apart along edges and 12 apart on inside of panels 3 7 6 cm Screw 3 7 6 cm Screw 6 15 2 cm 12 30 5 cm 1 2 5 cm Flush Flush OY Temporary Brace Flush Flush Flush Flush 5 7 8 14 9 cm Your front wall is now assemb...

Page 26: ... B 4 2 3 7 6 cm x12 2 5 1 cm x27 BACK WALL INSTALLATION D O O R 3 Nails into bottom plate 3 7 6 cm Screws x2 BEGIN Center back wall assembly on the 144 floor dimension Note The 4 wall overhang is installed to the top 1 144 365 8 cm 4 10 2 cm Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig B Use GKA as a temporary brace Secure GKA with 2 3 screws Fig A 3 7 6 cm x2 Fig A GKA TEMPORARY x1 GKA 2 ...

Page 27: ...wall assembly on the 144 front floor dimension Use 2 OFB as temporary braces Level wall and secure OFB with 3 screws 2 1 144 365 8 cm Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig A Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nail to hit floor frame Fig A 3 Secure wall bottom plates to floor with 3 nails Fig A x2 2 x 4 x 78 1 16 5 1 x 10 2 x 198 3 cm OFB TEMP...

Page 28: ... cm SP x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP BEGIN 1 2 TP SP 3 7 6 cm Nails Stagger seams Flush Flush 3 7 6 cm Nails Flush Flush Flush at seam Flush at seam Center doublers SP and TP on back wall top plate Secure with 3 nails evenly spaced Center doublers SP and TP on front wall top plate Secure with 3 nails evenly spaced TP SP ...

Page 29: ...SDC 2 5 1 cm Screw 2 5 1 cm Screw BEGIN Install rafters on front and back wall doublers Ensure rafters are flush to end of top plates Fig B Fig D Secure rafters as shown in all Figures 1 2 5 1 cm Screw Flush Fig A 2 5 1 cm Screw Flush Fig C 3 7 6 cm Screw Fig B 3 7 6 cm Screw Fig D Flush Flush 3 7 6 cm Screw 3 7 6 cm Screw ...

Page 30: ...28 OUTER RAFTER INSTALLATION PARTS REQUIRED x20 1 1 2 3 8 cm x2 H 2 5 Tie Plate Fasten tie plates with 1 1 2 nails as shown 2 Your outer rafters are now installed FINISH 1 1 2 3 8 cm Nails ...

Page 31: ...red into outer rafter ends Fig A Continue securing rafters with 3 screws toe screwed into doublers Fig B 2 BEGIN Measure and mark location of each rafter Note the door location 1 BEGIN HERE 10 25 4 cm 26 66 1 cm 42 106 7 cm 58 147 4 cm 74 188 cm DOOR 90 228 6 cm 106 269 3 cm 122 309 9 cm 138 350 5 cm 2 5 1 cm Screw Flush Fig A 3 7 6 cm Screws angled Flush Fig B SDC ...

Page 32: ...30 RAFTERS PARTS REQUIRED Your rafters are now installed FINISH x9 H 2 5 Tie Plate Install 9 tie plates with 1 1 2 nails as shown Fig A 3 FRONT 1 1 2 3 8 cm x90 1 1 2 3 8 cm Nails Fig A ...

Page 33: ...g B Secure panel with 2 2 nails in the bottom corners Fig A Angle nails to hit floor frame Fig C Center and fasten OO as a temporary support Measure down from floor 1 and mark Secure to floor joist with 2 3 screws Push the front and or back wall until front and side wall panels are flush along the corner Fig B Fig D Secure upper corner with 1 1 1 2 nail into rafter 3 2 1 1 1 2 Nail 1 2 5 cm BEGIN ...

Page 34: ...ure the measurement between the panel edges are the same along the corner Fig F Secure panel with 1 1 1 2 nail in upper corner 4 2 Nail Flush Panels Flush at bottom 5 Secure lower edge of panels to floor with 2 nails spaced 6 apart Angle nails to hit floor frame Fig G Secure side wall panels to rafter and wall studs with 1 1 2 nails spaced 6 apart as shown Repeat STEPS 1 5 to install the opposite ...

Page 35: ...e side side wall studs 3 Fig B Fig A Center NES on seam of wall panels KTB NES OFB 3 7 6 cm Screw D O O R MARK BEGIN Install NES centered at seam of side wall panels Fig A Use a square to ensure 90 degree squareness of studs KTB NES and OFB Mark locations of studs and ensure studs are at 90 degree angle to floor and flush to end rafter Secure studs with 3 screws into rafter and floor frame Fig B 1...

Page 36: ...er panel using 2 1 1 2 nails Flush filler panel to installed panels Red for right side as shown Measure and mark location of studs 20 from center of panel seam as shown Secure side wall panels to inside wall studs with 1 1 2 nails 6 apart along panel seam and 12 apart in middle of panels 2 Repeat STEPS 1 2 to secure the opposite side wall panels BEGIN 1 6 15 2 cm 12 30 5 cm 20 50 8 cm 20 50 8 cm 1...

Page 37: ...nsure the panel measures 3 4 on the rafter center Fig B Secure panel with 2 nails as shown D O O R D O O R Place the 10 11 16 x 31 7 8 and 10 11 16 x 28 lower roof panels flush to the chalk line and installed panel Fig C Secure panels with 2 nails as shown 2 Flush Fig C 3 4 1 9 cm Fig B Gauge Block Flush Flush 7 5 8 19 4cm Measure up 7 5 8 and snap a chalk line 7 16 x 10 11 16 x 96 1 1 x 27 1 x 24...

Page 38: ...e the roof by installing one 48 x 96 panel at this time Use the panel s long edge as a lever to bring your roof into square Place the 48 x 96 roof panel as shown Use the gauge block to maintain 3 4 at rafter center Fig B Panel should be flush to lower roof panels Secure with 1 2 nail in each corner DOOR 3 Flush Flush 5 7 8 14 9 cm 5 7 8 14 9 cm Fig E 5 7 8 14 9 cm NOTE Measurement from rafter edge...

Page 39: ...center Secure panel with 1 2 nail in each corner Install 3rd 48 x 96 panel flush to installed panels Maintain 3 4 at rafter center Secure panel with 1 2 nail in each corner Install 11 7 8 x 96 panel flush to installed panels Maintain 3 4 at rafter center Secure panels with 1 2 nail in each corner Flush Flush 3 4 1 9 cm Gauge Block 3 4 1 9 cm Gauge Block 11 7 8 x 96 30 2 x 244 cm 48 x 96 121 9 x 24...

Page 40: ...ROOF PANELS PARTS REQUIRED 2 5 1 cm Complete the securing of all upper roof panels with 2 nails spaced 6 along edge and 12 inside panel 7 Your roof panels are now installed FINISH 6 15 2 cm 12 30 5 cm x148 ...

Page 41: ...ith 2 screws through roof panels Fig A Secure with 4 screws at roof panel seams Install QVA extensions flush with side wall panels Fig B HINT Use screws at rafter ends as a guide to line up QVA with rafter ends Line up QVA with rafter screws FINISH SQUARE DOOR Your rafter extensions are now installed BEGIN 1 90o SQUARE Fig A 2 5 1 cm Screws Fig B Flush Front Panel Front Panel Flush Fig B Flush ...

Page 42: ...1 Align THB edge flush with rafter extension Fig A Secure with 3 2 nails Fig B BEGIN HJ THB 2 3 Install HJ flush to THB and secure with 5 2 nails Fig A FIg B Repeat STEPS 1 2 on opposite side You have finished installing your gable rake framing FINISH Fig B 2 5 1 cm Nail Flush Flush at seam Angled Ends Flush Fig A Rafter Extension ...

Page 43: ...ide down flush to front wall panel Fig A Secure to side rake frame THB with 7 2 finish nails Fig A B Repeat STEP 1 on opposite side BEGIN Your side soffit panels are now installed FINISH 3 2 Finish Nails 2 Finish Nails FRONT WALL PANEL Fig A Fig B 5 1 4 x 94 7 16 13 3 x 242 5 cm Flush Flush Flush THB THB THB 94 7 16 Soffit ...

Page 44: ...ions and flush to side wall soffit Fig A Ensure each soffit is flush to front wall panel Secure soffit panels with 2 2 finish nails into each rafter extension Use 4 finish nails at seam Fig B BEGIN PARTS REQUIRED x24 2 5 1 cm FRONT SOFFIT Your front soffit panels are now installed FINISH 2 Finish Nails 75 5 8 191 2 cm 79 5 8 202 2 cm Flush Fig B Flush Flush Flush Fig A ...

Page 45: ...g A Right side of WAB is approximately 3 4 from center of rafter extension Secure WAB using 2 finish nails into rafter extensions Fig B BEGIN 1 x1 19 32 x 3 1 2 x 60 1 2 1 5 x 8 8 x 153 7 cm WAB 2 Finish Nails 1 4 3 4 APPROXIMATELY 60 1 2 157 3 cm FRONT WALL Flush Flush Rafter Extension WAB Fig B 2 Finish Nails TOP VIEW 1 4 Fig A Rafter Extension ...

Page 46: ...ling your front fascia Position ZX primed side out flush with WAB and flush up under roof panels Secure ZX using 2 finish nails into rafter extensions Fig B 2 19 32 x 3 1 2 x 96 1 5 x 8 8 x 243 8 cm x1 ZX 2 Finish Nails Flush Flush Flush ZX WAB Fig B 2 Finish Nails Rafter Extension ...

Page 47: ... 15 16 5 1 x 7 6 x 81 1 cm RMA x2 19 32 x 3 1 2 x 45 1 5 x 8 9 x 114 3 cm WQA x1 19 32 x 3 1 2 x 61 1 16 1 5 x 8 9 x 155 1 cm UDR x1 19 32 x 3 1 2 x 61 1 16 1 5 x 8 9 x 155 1 cm UDL x2 OY 2 x 3 x 72 5 1 x 7 6 x 182 8 cm BEGIN 1 2 4 3 OY OY RMA RMA Fig B Edges of UDR and RMA are flush UDR WQA OY RMA Fig D Edges of UDL and RMA are flush UDL WQA OY RMA To build right side fascia assembly place RMA an...

Page 48: ...it Fig A Fig B Install fascia assembly under roof panels flush with front fascia board Secure with 6 2 screws through roof sheathing Fig A 2 x1 LEFT FASCIA ASSEMBLY LEFT FASCIA ASSEMBLY FRONT WALL ROOF SHEATHING Fig B Tight FRONT FASCIA LEFT FACIA ASSEMBLY 2 Screws Fig A Flush ROOF SHEATHING SIDE SOFFIT 2 Screws SIDE OF SHED ...

Page 49: ... opposite side to install right fascia 4 Secure front fascia to side fascia with 2 2 finished nails Fig D x18 2 5 1 cm Nail up through side soffit into fascia assembly Secure with 7 2 finish nails Fig C 3 x1 RIGHT FASCIA ASSEMBLY 2 Finish Nails Flush Fig D 2 Finish Nails Fig C 2 Finish Nails FRONT WALL ...

Page 50: ...EAR FASCIA TRIM PARTS REQUIRED 48 x2 x10 2 5 1 cm 3 7 6 cm BEGIN 1 Install PT and GKA using 2 wood screws through roof sheathing Fig A Secure PT and GKA with 1 3 screw through side fascia trim nailer OY Fig B 2 2 Screw PT GKA Fig A PT GKA BACK OF SHED 3 Screw Fig B PT or GKA OY Flush ...

Page 51: ... x 96 1 5 x 8 8 x 243 8 cm x1 ZX REAR FASCIA TRIM PARTS REQUIRED 49 x12 2 5 1 cm Install HBA and ZX to PT and GKA Secure with 2 finish nails Fig C Ensure trim is primed side out 3 FINISH Your rear fascia trim is now installed HBA ZX 2 Finish Nail ZX HBA Flush Fig C ...

Page 52: ...er trim is now installed FINISH 2 5 1 cm Finish Nail Flush to soffit board Fig A 73 5 16 Corner Trim SIDE WALL PANEL Place 73 5 16 back corner trim flush to bottom of back soffit board Fig A and flush with side panel Fig B Secure trim with 14 2 finish nails into corner wall framing Space nails equally Flush Fig B ...

Page 53: ...EPS 1 2 for opposite side Install 93 1 8 side front corner trim flush to front wall panel Fig A Secure trim with 9 2 finish nails spaced evenly Install 73 7 16 side back corner trim flush to back wall trim Fig B Secure trim with 7 2 finish nails spaced evenly BEGIN 1 2 2 5 1 cm Finish Nails Angled end flush up to soffit 2 x 93 1 8 2 x 73 7 16 Fig B Flush to back corner trim 2 Finish Nail Angled en...

Page 54: ...nails evenly Install 2 ZD trim pieces centered and flush up to soffit Secure trim with 14 2 finish nails into top plate Space nails evenly BEGIN 1 2 CENTER VAA VAA ZD ZD Fig A Flush to side corner trim 2 Finish Nail Flush Flush Flush Flush Flush Flush Flush 2 5 1 cm Finish Nails Nail into Top Plate x2 19 32 x 2 1 2 x 72 3 4 1 5 x 6 3 x 184 8 cm x2 19 32 x 2 1 2 x 90 5 8 1 5 x 6 3 x 230 2 cm Push t...

Page 55: ...nter of opening and level Secure with 4 screws on sides of each window Apply high quality exterior grade caulk behind frame near edge before installing to seal window 2 You must caulk around windows to validate warranty 3 4 1 9 cm x16 4 3 4 1 9 cm Screws per window ...

Page 56: ...1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm x1 x1 Left Door Right Door x2 x4 1 x 3 x 5 2 5 x 7 6 x 12 7 cm x1 GAA Place doors on flat surface 3 8 offset is to top Look for red right and green left on hinge board Attach temporary supports OO and GAA as shown BEGIN 1 OO x1 69 175 3 cm Door Stiffener ...

Page 57: ...temporary supports and check to make sure doors open and close properly Center 3 8 measurement on mark 3 8 1 cm Fig B Flush against wall panels Fig A OO 2 3 Screw hinge boards into wall supports with 10 3 screws as shown Make sure screws go into framing 4 Install OO flush under panels Secure to floor frame with 2 3 screws Fig A Mark center of door opening OO TEMPORARY SUPPORT 2 3 7 6 cm Screws ...

Page 58: ... 4 special coating screws into floor Fig D 6 Center trim OWB over doors and secure using 5 2 nails into framing 4 Reinforce the door trim with 3 4 screws through door panel into trim Fig A Locate screws as shown Fig B BEGIN x5 2 5 1 cm CENTER 2 5 1 Finish Nails AH AH FDA FDA OWB Nail into framing 3 4 1 9 cm Screws from behind Door Trim Hinge Board Fig A Door Panel 3 4 1 9 cm Screws Flush Flush x1 ...

Page 59: ...2 OFFSET Screws 2 5 1 cm Fig B IT IS IMPORTANT TO HOLD THESE DIMENSIONS 1 2 5 cm 1 2 5 cm BEGIN Center OO vertically on the left door in the door opening flush with the edge of door Fig A 1 Repeat Steps 1 2 to install OO on right door Secure using 5 2 screws through outside trim into OO Fig B 2 Your door stiffeners are now installed FINISH ...

Page 60: ...3 cm Door Stiffener 69 175 3 cm Door Stiffener 3 8 drill for bolt 1 1 2 deep 3 8 drill for bolt 1 1 2 deep OVER DOOR FRAME FLOOR OO OO x4 x4 CENTER CENTER Flush and center bottom spring bolt to bottom of OO Fig B Secure with 4 1 1 4 screws 1 1 4 3 2 cm 1 1 4 3 2 cm With door closed mark center location of spring bolt pin on metal threshold Fig C Raise spring bolt pin and open door Pre drill metal ...

Page 61: ... handle is now installed FINISH Pre drill 1 4 hole at mark Finish hole using 1 2 drill bit Position hardware in hole and secure with screws as shown 2 Measure and mark position on right door as shown x2 1 1 2 3 8 cm PARTS REQUIRED DOOR HARDWARE BEGIN 1 TOP VIEW 1 4 Pre drill and 1 2 Drill through 1 3 4 4 4 cm 35 3 4 90 8 cm ...

Page 62: ...pace nails evenly Center 5 EY on gap between window frames as shown Secure with 10 2 finish nails into framing x5 19 32 x 2 1 2 x 9 1 5 x 6 4 x 22 9 cm EY x24 19 32 x 2 1 2 x 58 3 4 1 5 x 6 3 x 149 2 cm x4 TTB 2 5 1 cm Finish Nails CENTER CENTER CENTER CENTER CENTER CENTER Flush Flush to over door trim Flush to over door trim Flush Flush Flush Flush Flush 2 5 1 cm Finish Nails Nail into GAP TTB TT...

Page 63: ...s and window trim FINISH Install 4 3 4 screws from inside into window trim as shown Do not screw into window flange NOTE Snip off protruding finish nails from inside of front wall WINDOW TRIM OUTSIDE INSIDE OF SHED Install 4 3 4 1 9 cm Screws from inside 3 4 1 9 cm x4 You must caulk completely around window frame to validate your warranty Use a paintable exterior rated caulk TTB TTB Flush CENTER ...

Page 64: ... shown 1 at top and 1 at bottom Cut out marked openings Caulk behind vent flanges Secure using 1 2 1 3 cm screws Your vents are now installed x12 1 2 1 3 cm x2 8 x 16 20 3 x 35 6 cm 6 15 2 cm 3 5 7 6 12 7 cm 14 35 6 cm Caulk 4 10 1 cm Caulk 4 10 1 cm 4 10 1 cm 14 35 6 cm 6 15 2 cm VENTS ...

Page 65: ...fore painting Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED Cut drip edge flush to trim BACK OF SHED Cut drip edge flush to trim NOTE Install drip edge to back of shed before installing roofing felt Install roofing felt flush to all roof edges overlapping 3 2 DRIP EDGE PARTS REQUIRED BEGIN 1 Install drip edge flush along back roof panels Flush ends to trim Secure with 1 roofi...

Page 66: ...Edge first 3 Install side drip edge flush along roof panels Flush ends to trim Fig A Secure with 1 roofing nails 6 apart Only nail top of drip edge OVERLAP 16 TYP 40 6 cm 1 Roofing Nails Drip Edge Roof Felt Drip Edge Fig A DRIP EDGE PARTS REQUIRED FINISH Your roof is now ready to shingle x24 1 2 5 cm ...

Page 67: ...Install first starter row upside down color up and flush to drip edge at bottom of roof panel Use 4 nails per shingle Starter row must be straight and level all the way across with lower edge of roof deck Begin where indicated on image below install first row of shingles with notch flush with drip edge 2 2 Drip Edge Notch BACK OF SHED START HERE BACK OF SHED TABS UP BEGIN Shingle overlaps roof dec...

Page 68: ... shed make sure there is a maximum of 5 or less to the rain slot as shown below If shingles overlap at front roof edge cut to roof edge with a utility knife 1 2 5 cm 5 12 7 cm 5 12 7 cm or less BACK OF SHED Flush with rain slots Notch Notch Using your shingle hooked blade carefully cut shingles along chalk line 3 5 4 6 SHINGLES continued If more than 5 to rain slot you must install another row of ...

Page 69: ...ow with 1 overhang over roof edge Align remaining shingles with edge of the front drip edge Using your shingle hooked blade carefully cut shingles on a flat surface along the rain slots using a chalk line for reference You have finished shingling your roof FINISH 7 9 8 ...

Page 70: ...ls 3 8 NG 5 1 4 X 94 7 16 SOFFIT K 94070504000 2 Right Wall Filler 3 8 NG 2 11 16 X 12 1 4 WALL FILLER K 12040211100 1 Left Wall Filler 3 8 NG 2 11 16 X 12 1 4 WALL FILLER K 12040211200 1 Front Wall Soffit 3 8 NG 10 3 8 X 75 5 8 SOFFIT K 7510100600S 1 Front Wall Soffit 3 8 NG 10 3 8 X 79 5 8 SOF K 7910100600S 1 Right Back Corner Trim 3 8 NG 2 X 73 7 16 12 5 O E K 73070200130 1 Left Back Corner Tri...

Page 71: ... siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent st...

Reviews: